Fiscal impact reports (FIRs) are prepared by the Legislative Finance Committee (LFC) for standing finance
committees of the NM Legislature. The LFC does not assume responsibility for the accuracy of these reports
if they are used for other purposes.
Current FIRs (in HTML & Adobe PDF formats) are a vailable on the NM Legislative Website (legis.state.nm.us).
Adobe PDF versions include all attachments, whereas HTML versions may not. Previously issued FIRs and
attachments may be obtained from the LFC in Suite 101 of the State Capitol Building North.
F I S C A L I M P A C T R E P O R T
SPONSOR Luna.
DATE TYPED 2/13/05
HB 558
SHORT TITLE Belen Water and Sewer Line Asbestos Abatement
SB
ANALYST Hadwiger
APPROPRIATION
(in $000s)
Appropriation Contained Estimated Additional Impact Recurring
or Non-Rec
Fund
Affected
FY05
FY06
FY05
FY06
$420.0
Non-Recurring General Fund
(Parenthesis ( ) Indicate Expenditure Decreases)
Duplicates SB514.
SOURCES OF INFORMATION
LFC Files
Responses Received From
Department of Finance and Administration (DFA)
Department of Environment (NMED)
SUMMARY
Synopsis of Bill
House Bill 558 appropriates $420,000 from the general fund to the Department of Environment
(NMED) in FY06 to abate asbestos and remediate other hazardous materials from water and
sewer lines on Mesa Road in Belen.
Significant Issues
According to DFA, in October 2004, Albuquerque Asphalt hit an abandoned cement water line
while performing contract work on Mesa Road located in the City of Belen. In such an event, a
project typically would be halted for environmental assessment. In this case, the contractor
crushed the material and spread the shards in a 2,400-foot trench. A construction employee
noted that the pipe contained asbestos and reported it to the Environmental Protection Agency.
The project immediately was halted and clean-up of the crushed material was performed at a to-
tal cost of $420,000. Clean-up was completed on December 28, 2004. The City of Belen is
seeking funding to pay the environmental consultants and remediation contractor for the work.
pg_0002
House Bill 558 -- Page 2
Albuquerque Asphalt and other contractors involved in the road project have performance bonds
that may pay for the remediation work, but the City of Belen advises that a settlement could take
twelve months or longer to finalize.
FISCAL IMPLICATIONS
The appropriation of $420,000 contained in this bill is a non-recurring expense to the general
fund. Any unexpended or unencumbered balance remaining at the end of FY06 would revert to
the general fund.
CONFLICT, DUPLICATION, COMPANIONSHIP, RELATIONSHIP
Duplicates SB514.
TECHNICAL ISSUES
DFA identified two technical questions:
1.
The appropriation covers remediation expenditures in FY06 whereas the actual remedia-
tion expenditures took place in FY05. It may be advisable to amend the bill to include
FY05 and FY06.
2.
If a settlement is reached to cover part or all of the remediation work, the residual balance
of the appropriation could be used for hazardous cleanup on other areas of Mesa Road in
FY06.
OTHER SUBSTANTIVE ISSUES
Both NMED and DFA were concerned that HB558 might set a precedent for state reimburse-
ment of local costs for asbestos or other hazardous waste remediation. NMED was further con-
cerned that, if the appropriation passes, municipalities, even as the generator of such asbestos
wastes, will not suffer enforcement action, penalties, or even the routine expense of abatement,
but contractors may be subject to such penalties.
ALTERNATIVES
NMED noted that the City of Belen should utilize provisions in its construction contract, bond-
ing, other insurance-related options, and/or litigation with its contractor(s) to recoup funding for
the emergency asbestos abatement. The City can apply for a Rural Infrastructure Program (RIP)
loan from NMED to meet their immediate needs until the conflict is resolved with the contrac-
tor(s).
The Board of Finance approved a $145,000 loan to Belen in December for this purpose, to be
repaid from a settlement with the contractor. If additional funds are required until the settlement
is complete, it might be possible to seek additional funds from that source as other Board of Fi-
nance loans are repaid.
POSSIBLE QUESTIONS
1.
What is the status of the settlement with Albuquerque Asphalt.
pg_0003
House Bill 558 -- Page 3
2.
Would this appropriation be reimbursed to the state if the settlement with the contractor
assumes all of the costs of this remediation.
3.
Will a state appropriation encourage a settlement with the contractor that places more or
all of the responsibility for remediation upon Belen and the State of New Mexico.
DH/yr:lg