SENATE FINANCE COMMITTEE SUBSTITUTE FOR

SENATE BILL 213

55th legislature - STATE OF NEW MEXICO - second session, 2022

 

 

 

 

 

 

 

AN ACT

RELATING TO CAPITAL EXPENDITURES; REAUTHORIZING OR REAPPROPRIATING BALANCES, EXPANDING OR CHANGING PURPOSES, EXTENDING EXPENDITURE PERIODS, CHANGING AGENCIES AND ESTABLISHING CONDITIONS FOR THE REVERSION OR TRANSFER OF UNEXPENDED BALANCES OF APPROPRIATIONS MADE BY THE LEGISLATURE IN PRIOR YEARS; DECLARING AN EMERGENCY.

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF NEW MEXICO:

     SECTION 1. SEVERANCE TAX BONDS--REVERSION OF PROCEEDS.--

          A. Except as otherwise provided in another section of this act:

                (1) the unexpended balance from the proceeds of severance tax bonds issued for a project that has been reauthorized in this act shall revert to the severance tax bonding fund:

                     (a) at the end of the expenditure period as set forth in this act, if the expenditure period is changed in this act; or

                     (b) if the expenditure period is not changed in this act, pursuant to the time frame set forth in the law that originally authorized the severance tax bonds or the time frame set forth in any law that has previously reauthorized the expenditure of the proceeds, whichever is later; and

                (2) all remaining balances from the proceeds of severance tax bonds issued for a project that has been reauthorized in this act shall revert to the severance tax bonding fund three months after the reversion date for the unexpended balances.

          B. For the purpose of this section, "unexpended balance" means the remainder of an appropriation after reserving for unpaid costs and expenses covered by binding written obligations to third parties.

     SECTION 2. GENERAL FUND AND OTHER FUND APPROPRIATIONS--REVERSIONS.--

          A. Except as otherwise provided in another section of this act:

                (1) the unexpended balance of an appropriation from the general fund or other state fund that has been changed in this act shall revert:

                     (a) at the end of the expenditure period as set forth in this act, if the expenditure period is changed in this act; or

                     (b) if the expenditure period is not changed in this act, pursuant to the time frame set forth in the law in which the original appropriation was made or the time frame set forth in any law that has previously changed the appropriation, whichever is later; and

                (2) all remaining balances of an appropriation from the general fund or other state fund that has been changed in this act shall revert three months after the reversion date for the unexpended balance.

          B. Except as provided in Subsection C of this section, the balance of an appropriation made from the general fund or other state fund shall revert pursuant to Subsection A of this section to the originating fund.

          C. The balance of an appropriation made from the general fund or other state fund to the Indian affairs department or the aging and long-term services department for a project located on lands of an Indian nation, tribe or pueblo shall revert pursuant to Subsection A of this section to the tribal infrastructure project fund.

          D. For the purpose of this section, "unexpended balance" means the remainder of an appropriation after reserving for unpaid costs and expenses covered by binding written obligations to third parties.

     SECTION 3. PASEO DEL VOLCAN LOOP BYPASS ROAD CONSTRUCTION--CHANGE TO PASEO DEL VOLCAN CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the department of transportation originally authorized in Subsection 57 of Section 25 of Chapter 66 of Laws 2014 to acquire rights of way for and to plan, design and construct paseo del Volcan loop bypass road from Unser boulevard to interstate 40 in Bernalillo and Sandoval counties and reauthorized in Laws 2018, Chapter 68, Section 3 and for which the time of expenditure was extended in Laws 2020, Chapter 82, Section 3 shall not be expended for the original purpose but is changed to acquire rights of way for and to plan, design and construct paseo del Volcan in Bernalillo and Sandoval counties. The time of expenditure is extended through fiscal year 2024.  

     SECTION 4. PASEO DEL VOLCAN CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 1 of Section 32 of Chapter 80 of Laws 2018 to acquire rights of way and to design and construct paseo del Volcan, also known as New Mexico highway 347, in Sandoval and Bernalillo counties is extended through fiscal year 2024.

     SECTION 5. PASEO DEL VOLCAN RIGHTS OF WAY ACQUISITION AND CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 1 of Section 24 of Chapter 81 of Laws 2016 to acquire rights of way and to design and construct paseo del Volcan, also known as New Mexico highway 347, in Sandoval and Bernalillo counties and for which the time of expenditure was extended in Laws 2020, Chapter 82, Section 4 is extended through fiscal year 2024.

     SECTION 6. PASEO DEL VOLCAN RIGHTS OF WAY ACQUISITION--CHANGE TO PASEO DEL VOLCAN CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the department of transportation in Subsection 61 of Section 24 of Chapter 81 of Laws 2016 to purchase rights of way for paseo del Volcan from Unser boulevard to the Bernalillo-Sandoval county line and for which the time of expenditure was extended in Laws 2020, Chapter 82, Section 79 shall not be expended for the original purpose but is changed to acquire rights of way and to plan, design and construct paseo del Volcan in Bernalillo and Sandoval counties. The time of expenditure is extended through fiscal year 2024.

     SECTION 7. ATRISCO HERITAGE ACADEMY HIGH SCHOOL ACCESS ROAD CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project originally authorized in Subsection 7 of Section 24 of Chapter 81 of Laws 2016 to plan, design and construct an access road to Atrisco Heritage academy high school, including driveways, trail connections and modifications to Senator Dennis Chavez boulevard and to 118th street, in Albuquerque in Bernalillo county and reauthorized in Laws 2020, Chapter 82, Section 16 to include sidewalks and signal modifications is extended through fiscal year 2024.

     SECTION 8. BERNALILLO COUNTY FAMILY SERVICES FACILITIES IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 53 of Section 26 of Chapter 80 of Laws 2018 to plan, design and construct renovations and improvements to the buildings and grounds of a child development and family services facility site in the South Valley in Bernalillo county and to purchase and install teleconferencing and information technology equipment at facility sites in the South Valley and the southeast heights in Albuquerque in Bernalillo county is extended through fiscal year 2024.

     SECTION 9. BERNALILLO COUNTY HOMELESS FACILITY SHOWERS AND LAUNDRY CONSTRUCTION--CHANGE TO FACILITY IMPROVEMENTS--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division project in Subsection 7 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct, purchase, furnish, equip and install accessible showers and laundry services for a facility serving the homeless in Bernalillo county shall not be expended for the original purpose but is changed to plan, design, purchase, install, equip and furnish a facility, including information technology and related furniture, equipment and infrastructure, white goods and vehicles, for an agency providing services to the homeless in Bernalillo county.

     SECTION 10. BERNALILLO COUNTY MULTI-USE INDOOR SPORTS FACILITY--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 7 of Section 26 of Chapter 80 of Laws 2018 to plan, design, construct, equip and furnish a multi-use indoor sports facility in Bernalillo county is extended through fiscal year 2024.

     SECTION 11. INTERNATIONAL SCHOOL AT MESA DEL SOL IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the public education department project in Subsection 8 of Section 16 of Chapter 80 of Laws 2018 to plan, design, construct, renovate, furnish and equip buildings, grounds and physical education changing rooms, including the purchase and installation of related equipment, fencing, information technology, wiring, paving and infrastructure, for the international school at Mesa del Sol charter school in Bernalillo county is extended through fiscal year 2024.

     SECTION 12. ISLETA BOULEVARD SOUTHWEST IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 5 of Section 32 of Chapter 80 of Laws 2018 to design and construct improvements to Isleta boulevard from Muniz road SW to United States interstate highway 25 in Bernalillo county is extended through fiscal year 2024.  

     SECTION 13. ALBUQUERQUE SIGN LANGUAGE ACADEMY FACILITY CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the public education department project in Subsection 3 of Section 16 of Chapter 80 of Laws 2018 to plan, design and construct a facility for the Albuquerque sign language academy in Albuquerque in Bernalillo county is extended through fiscal year 2024.

     SECTION 14. TWENTY-FIRST CENTURY PUBLIC ACADEMY CHARTER SCHOOL HEATING, VENTILATION AND AIR CONDITIONING SYSTEM IMPROVEMENTS--EXTEND TIME--GENERAL FUND.--The time of expenditure for the public education department project originally authorized in Subsection 27 of Section 63 of Chapter 81 of Laws 2020 and reauthorized in Laws 2021, Chapter 139, Section 11 to plan, design, construct, renovate, furnish and equip buildings and grounds and to purchase and install heating, ventilation and air conditioning and air filtration systems and related equipment and to purchase and install information technology, including related equipment, furniture and infrastructure, and for wiring and fencing for the Twenty-First Century public academy charter school in Albuquerque in Bernalillo county is extended through fiscal year 2024.

     SECTION 15. ALBUQUERQUE COLLEGIATE CHARTER SCHOOL SECURITY SYSTEMS PURCHASE--EXPAND PURPOSE--EXTEND TIME--GENERAL FUND.--The public education department project in Subsection 9 of Section 63 of Chapter 81 of Laws 2020 to equip and install a security system and related infrastructure and equipment for the Albuquerque Collegiate charter school in Albuquerque in Bernalillo county may include the purchase and installation of security cameras. The time of expenditure is extended through fiscal year 2024.

     SECTION 16. ALBUQUERQUE CRESTVIEW BLUFF OPEN SPACE ACQUISITION--CHANGE TO ALBUQUERQUE CRESTVIEW BLUFF PARKS AND TRAILS--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 34 of Section 29 of Chapter 138 of Laws 2021 to acquire property for and to plan, design, construct and equip the Crestview bluff open space area in Albuquerque in Bernalillo county shall not be expended for the original purpose but is changed to acquire property for and to plan, design, construct and equip the Crestview bluff open space area, parks and trails in Albuquerque in Bernalillo county.

     SECTION 17. BERNALILLO COUNTY CRESTVIEW BLUFFS PURCHASE--CHANGE TO ALBUQUERQUE CRESTVIEW BLUFF OPEN SPACE AREA, PARKS AND TRAILS CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 5 of Section 34 of Chapter 277 of Laws 2019 to acquire property for a Crestview bluffs open space area and to match funds for a national park service land and water conservation fund grant for the purchase of Crestview bluffs in Bernalillo county shall not be expended for the original purpose but is changed to acquire property for and to plan, design, construct and equip an open space area, parks and trails in the Crestview bluff area in Albuquerque in Bernalillo county. The time of expenditure is extended through fiscal year 2024.

     SECTION 18. ALBUQUERQUE CRESTVIEW BLUFF GREEN SPACE CONSTRUCTION--CHANGE TO OPEN SPACE, PARKS AND TRAILS CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 43 of Section 34 of Chapter 277 of Laws 2019 to acquire property and to plan, design and construct an urban green space along the Crestview bluff area off the Arenal drain from west central avenue to Bridge boulevard both within and outside the city limits of Albuquerque in Bernalillo county shall not be expended for the original purpose but is changed to acquire property for and to plan, design, construct and equip the Crestview bluff open space area, parks and trails in Albuquerque in Bernalillo county. The time of expenditure is extended through fiscal year 2024.

     SECTION 19. ALBUQUERQUE RADIO COMMUNICATIONS BUREAU BUILDING CONSTRUCTION--CHANGE TO DEPARTMENT OF PUBLIC SAFETY ADMINISTRATIVE COMPLEX CONSTRUCTION--CHANGE AGENCY--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the department of information technology in Subsection 1 of Section 31 of Chapter 81 of Laws 2020 to plan, design, construct, renovate, furnish and equip a building for the Albuquerque radio communications bureau in Albuquerque in Bernalillo county shall not be expended for the original purpose but is appropriated to the capital program fund to acquire land for and to plan, design, construct, furnish and equip an administrative complex for the department of public safety in Albuquerque.

     SECTION 20. ALBUQUERQUE DISPATCH AND RECORDS MANAGEMENT SYSTEM--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 53 of Section 35 of Chapter 81 of Laws 2020 to upgrade the computer-aided dispatch and records management system for the Albuquerque police department in Bernalillo county is extended through fiscal year 2024.

     SECTION 21. ALBUQUERQUE DOMESTIC VIOLENCE SHELTER COTTAGES RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 54 of Section 35 of Chapter 81 of Laws 2020 to plan, design and construct renovations in cottages for victims of domestic abuse, including additional entries and bathrooms, in Albuquerque in Bernalillo county is extended through fiscal year 2024.

     SECTION 22. ALBUQUERQUE FIRE RESCUE COMMUNICATIONS AND DISPATCH EQUIPMENT PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 59 of Section 35 of Chapter 81 of Laws 2020 to purchase and equip fire communications and dispatch equipment for Albuquerque fire rescue in Albuquerque in Bernalillo county is extended through fiscal year 2024.

     SECTION 23. ALBUQUERQUE FIRE RESPONSE BRUSH TRUCK PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 60 of Section 35 of Chapter 81 of Laws 2020 to purchase and equip a brush truck for the city of Albuquerque in Bernalillo county is extended through fiscal year 2024.

     SECTION 24. ALBUQUERQUE PAT HURLEY PARK AND COMMUNITY CENTER IMPROVEMENTS--CHANGE TO IMPROVEMENTS TO THE JOAN JONES COMMUNITY CENTER--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 36 of Section 26 of Chapter 80 of Laws 2018 to plan, design, construct, expand, renovate, purchase and install phase 2 improvements to the Pat Hurley park and community center in Albuquerque in Bernalillo county shall not be expended for the original purpose but is changed to plan, design, construct, expand, equip and furnish phase 2 improvements to the Joan Jones community center in Albuquerque. The time of expenditure is extended through fiscal year 2024.

     SECTION 25. ALBUQUERQUE JUAN TABO HILLS FIRE STATION LAND ACQUISITION, CONSTRUCTION AND IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 26 of Section 26 of Chapter 80 of Laws 2018 to acquire land and rights of way and to plan, design, construct, renovate, upgrade and equip phase 1 of a fire station in the Juan Tabo Hills area of southeast Albuquerque in Bernalillo county is extended through fiscal year 2024.

     SECTION 26. ALBUQUERQUE POLICE DEPARTMENT CRIME SCENE VEHICLE PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 11 of Section 72 of Chapter 81 of Laws 2020 to purchase and equip a crime scene response vehicle for the police department in Albuquerque in Bernalillo county is extended through fiscal year 2024.

     SECTION 27. ALBUQUERQUE POLICE DEPARTMENT TECHNOLOGY MODERNIZATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 103 of Section 35 of Chapter 81 of Laws 2020 to purchase and equip video management system information technology, including automated license plate readers, for the Albuquerque police department in Albuquerque in Bernalillo county is extended through fiscal year 2024.

     SECTION 28. RIO RANCHO PUBLIC SCHOOL DISTRICT ROBOTICS PROGRAM EQUIPMENT--CHANGE AGENCY--EXTEND TIME--SEVERANCE TAX BONDS.--The public education department project in Subsection 167 of Section 17 of Chapter 138 of Laws 2021 to purchase, improve and install equipment and furnishings, including information technology, for a robotics program to assist youth in science, technology, engineering and mathematics in Rio Rancho in Sandoval county is appropriated to the local government division for that purpose. The time of expenditure is extended through fiscal year 2024.

     SECTION 29. ALBUQUERQUE SOUTHEAST/MID-HEIGHTS PARK CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 45 of Section 26 of Chapter 80 of Laws 2018 to acquire land for and to plan, design and construct a park facility in the southeast and mid-heights area of Albuquerque in Bernalillo county is extended through fiscal year 2024.

     SECTION 30. ALBUQUERQUE WEST CENTRAL REDEVELOPMENT DISTRICT INFRASTRUCTURE IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 50 of Section 26 of Chapter 80 of Laws 2018 to acquire land for and to plan, design and construct infrastructure improvements in the west Central avenue area for the west Central metropolitan redevelopment district in Albuquerque in Bernalillo county is extended through fiscal year 2024.

     SECTION 31. ALBUQUERQUE WOMEN'S MEMORIAL PARK CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 51 of Section 26 of Chapter 80 of Laws 2018 to construct a women's memorial park at Amole Mesa avenue and 118th street in Albuquerque in Bernalillo county is extended through fiscal year 2024.

     SECTION 32. BERNALILLO COUNTY BEHAVIORAL HEALTH PROGRAM PLAYGROUND AND VEHICLE EQUIPMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 2 of Section 72 of Chapter 81 of Laws 2020 to purchase and install a portable playground, to purchase and equip a vehicle and to purchase and install information technology equipment for behavioral health and forensic interview programs in Bernalillo county is extended through fiscal year 2024.

     SECTION 33. BERNALILLO COUNTY INDUSTRIAL TRANSLOAD FACILITY ROAD IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 4 of Section 32 of Chapter 80 of Laws 2018 to plan, design, construct and improve roads and drainage for an industrial park and transload facility in Bernalillo county is extended through fiscal year 2024.

     SECTION 34. BERNALILLO COUNTY TRANSITIONAL LIVING FACILITY IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 54 of Section 26 of Chapter 80 of Laws 2018 to plan, design and renovate buildings, including interior and exterior finish work, replacement of roof and building systems, the purchase and installation of security cameras and a security system and improvements to the parking lot and landscaping, at a transitional living center in Albuquerque in Bernalillo county is extended through fiscal year 2024.

     SECTION 35. EL CAMINO REAL ACADEMY CHARTER SCHOOL BUILDINGS AND GROUNDS RENOVATION--EXPAND PURPOSE--EXTEND TIME--GENERAL FUND.--The public education department project in Subsection 15 of Section 63 of Chapter 81 of Laws 2020 to purchase security fencing, including related equipment, for El Camino Real academy charter school in Albuquerque in Bernalillo county may include the purchase and installation of security camera systems. The time of expenditure is extended through fiscal year 2024.

     SECTION 36. GILBERT L. SENA CHARTER HIGH SCHOOL IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the public education department project in Subsection 7 of Section 16 of Chapter 80 of Laws 2018 to plan, design, construct, renovate, furnish and equip buildings and grounds, including the installation of a science lab and the installation of related equipment, fencing, information technology, wiring and infrastructure, for the Gilbert L. Sena charter school in Albuquerque in Bernalillo county is extended through fiscal year 2024.

     SECTION 37. HEALTH LEADERSHIP HIGH SCHOOL CHARTER SCHOOL BUILDING AND GROUNDS CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The time of expenditure for the public education department project in Subsection 84 of Section 63 of Chapter 81 of Laws 2020 to acquire, equip and install security equipment, fencing and related infrastructure and equipment for the Health Leadership high school charter school in the Albuquerque public school district in Bernalillo county is extended through fiscal year 2024.

     SECTION 38. LADERA ROAD NORTHWEST IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 13 of Section 32 of Chapter 80 of Laws 2018 to acquire rights of way and to plan, design and construct Ladera road NW, including pedestrian and traffic control features, between Gavin road and Coors boulevard in Albuquerque in Bernalillo county is extended through fiscal year 2024.

     SECTION 39. MILE HIGH LITTLE LEAGUE FIELDS AND INFRASTRUCTURE IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 32 of Section 26 of Chapter 80 of Laws 2018 to plan, design and construct improvements, renovations and upgrades to the fields and infrastructure of the Mile High little league in Albuquerque in Bernalillo county is extended through fiscal year 2024.

     SECTION 40. NATIONAL HISPANIC CULTURAL CENTER IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the cultural affairs department project in Subsection 4 of Section 9 of Chapter 80 of Laws 2018 to plan, design, construct, renovate, repair, furnish, equip and make other improvements to the site, facilities, theaters and exhibits, including the welcome center, art museum and annex warehouse, at the national Hispanic cultural center in Albuquerque in Bernalillo county is extended through fiscal year 2024.

     SECTION 41. UNIVERSITY OF NEW MEXICO OLYMPIC SPORTS TRAINING FACILITY CONSTRUCTION--EXTEND TIME--SEVERANCE TAX FUNDS.--The time of expenditure for the board of regents of the university of New Mexico project in Subsection 11 of Section 38 of Chapter 80 of Laws 2018 to plan, design, construct, purchase, install and equip an Olympic sports training facility at the university of New Mexico in Albuquerque in Bernalillo county is extended through fiscal year 2024.

     SECTION 42. TECHNOLOGY LEADERSHIP CHARTER HIGH SCHOOL IMPROVEMENTS--EXTEND TIME--GENERAL FUND.--The time of expenditure for the public education department project in Subsection 6 of Section 63 of Chapter 81 of Laws 2020 to purchase security systems, fencing and infrastructure for the Technology Leadership charter high school in the Albuquerque public school district in Bernalillo county is extended through fiscal year 2024.

     SECTION 43. RAMAH CHAPTER SOLID WASTE TRANSFER STATION CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 6 of Section 20 of Chapter 81 of Laws 2016 and reauthorized in Laws 2020, Chapter 82, Section 32 to plan, design and construct a solid waste transfer station, including a trash compactor dumpster, a trash bin and an operator building, in the Ramah chapter of the Navajo Nation in Cibola county is extended through fiscal year 2024.

     SECTION 44. ANGEL FIRE WATER STORAGE TANKS CONSTRUCTION AND REPAIR--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 7 of Section 18 of Chapter 81 of Laws 2016 to plan, design, construct and repair water storage tanks in Angel Fire in Colfax county and for which the time of expenditure was extended in Laws 2020, Chapter 82, Section 33 is extended through fiscal year 2024.

     SECTION 45. CLOVIS BUSINESS ENTERPRISE CENTER RENOVATIONS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 78 of Section 26 of Chapter 80 of Laws 2018 to plan, design, equip, remodel, furnish and improve the Clovis business enterprise center, including parking lots, alleys, the solar energy system, the power backup system, electrical systems, landscaping and lighting, in Curry county is extended through fiscal year 2024.

     SECTION 46. CLOVIS WELLNESS AND YOUTH DEVELOPMENT CENTER PHASE 2 CONSTRUCTION--CHANGE TO HILLCREST SENIOR CENTER CONSTRUCTION--CHANGE AGENCY--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 150 of Section 29 of Chapter 138 of Laws 2021 to plan, design and construct phase 2 of a wellness and youth development center in Clovis in Curry county shall not be expended for the original purpose but is appropriated to the aging and long-term services department to plan, design, construct, equip and furnish the Hillcrest senior center in Clovis.

     SECTION 47. GRADY DEFIBRILLATOR PURCHASE--CHANGE TO AMBULANCE AIR SUSPENSION KIT PURCHASE--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 23 of Section 72 of Chapter 81 of Laws 2020 to purchase and equip a defibrillator for the fire department in Grady in Curry county shall not be expended for the original purpose but is changed to purchase and equip an ambulance air suspension kit for Grady. The time of expenditure is extended through 2024.

     SECTION 48. GRADY POWERED COT FASTENER PURCHASE--CHANGE TO GRADY PARK RESTROOMS AND LIGHTING CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 24 of Section 72 of Chapter 81 of Laws 2020 to purchase and equip a powered cot fastener and medical transport equipment for the Grady volunteer fire department in Grady in Curry county shall not be expended for the original purpose but is changed to plan, design and construct restrooms and to purchase and install lighting at a park in Grady. The time of expenditure is extended through fiscal year 2024.

     SECTION 49. CURRY AND OTERO COUNTIES CONTAMINATED WATER SYSTEM IMPROVEMENTS--CHANGE TO TEXICO WATER SYSTEM IMPROVEMENTS--SEVERANCE TAX BONDS.--Up to one million five hundred thousand dollars ($1,500,000) of the unexpended balance of the appropriation to the department of environment in Subsection 56 of Section 26 of Chapter 81 of Laws 2020 to plan, design and construct improvements to contaminated water systems in Curry and Otero counties shall not be expended for the original purpose but is changed to plan, design, construct and improve contaminated water systems in Texico in Curry county.

     SECTION 50. BOSQUE REDONDO MEMORIAL IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the cultural affairs department project originally authorized in Subsection 4 of Section 8 of Chapter 81 of Laws 2016 to plan, design, construct, landscape and improve the Bosque Redondo memorial at the Fort Sumner historic site in De Baca county and reauthorized in Laws 2020, Chapter 82, Section 37 is extended through fiscal year 2024.

     SECTION 51. ZEUS AVENUE IMPROVEMENTS--CHANGE TO EASY LANE--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the department of transportation in Subsection 63 of Section 40 of Chapter 277 of Laws 2019 to acquire rights of way for and to plan, design and construct road and drainage improvements on Zeus avenue in the Butterfield area of Dona Ana county shall not be expended for the original purpose but is changed to acquire rights of way for and to plan, design and construct road and drainage improvements on Easy lane in Dona Ana county. The time of expenditure is extended through fiscal year 2024.

     SECTION 52. LAS CRUCES PARKING GARAGE CONSTRUCTION--CHANGE TO AMADOR HOTEL IMPROVEMENTS--EXTEND TIME--GENERAL FUND.--Up to two hundred thousand dollars ($200,000) of the unexpended balance of the appropriation to the local government division in Subsection 203 of Section 34 of Chapter 277 of Laws 2019 to plan, design, construct and equip a parking garage in Las Cruces in Dona Ana county shall not be expended for the original purpose but is changed to plan, design, construct, furnish, equip and install improvements, including related infrastructure, to the Amador hotel in Las Cruces. The time of expenditure is extended through fiscal year 2024.

     SECTION 53. LAS CRUCES COMMUNITY OF HOPE HEALTH FACILITY IMPROVEMENTS--CHANGE TO DENTAL AND HEALTH FACILITIES CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 89 of Section 26 of Chapter 80 of Laws 2018 to plan, design, construct, renovate, furnish and equip improvements to a health facility at the Mesilla Valley community of hope health complex in Las Cruces in Dona Ana county shall not be expended for the original purpose but is changed to plan, design, construct, furnish and equip dental and health facilities, including site preparation, sidewalks, lighting, security and sustainable energy systems, at the Mesilla Valley community of hope campus in Las Cruces in Dona Ana county. The time of expenditure is extended through fiscal year 2024.

     SECTION 54. LAS CRUCES CINEMATIC INFRASTRUCTURE CONSTRUCTION--CHANGE TO FILM AND DIGITAL MEDIA INFRASTRUCTURE--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division originally authorized in Subsection 114 of Section 28 of Chapter 3 of Laws 2015 (1st S.S.) and reauthorized in Laws 2019, Chapter 280, Section 42 to plan, design, construct, furnish and equip a facility owned by Las Cruces in Dona Ana county for film, digital media and entertainment arts production and for which the time of expenditure was extended in Laws 2021, Chapter 139, Section 30 shall not be expended for the original or reauthorized purpose but is changed to plan, design, construct, furnish and equip infrastructure that directly supports film and digital media economic development in Las Cruces in Dona Ana county pursuant to the Local Economic Development Act. The time of expenditure is extended through fiscal year 2024.

     SECTION 55. LAS CRUCES FILM MEDIA AND ENTERTAINMENT INFRASTRUCTURE CONSTRUCTION--CHANGE TO FILM AND DIGITAL MEDIA INFRASTRUCTURE--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division originally authorized in Subsection 104 of Section 22 of Chapter 66 of Laws 2014 and reauthorized in Laws 2015, Chapter 147, Section 24 to plan, design, construct, furnish and equip a facility and related infrastructure to be owned by Las Cruces in Dona Ana county for film, digital media and entertainment arts production and for which the time of expenditure was extended in Laws 2018, Chapter 68, Section 52 and again in Laws 2020, Chapter 82, Section 41 shall not be expended for its original or reauthorized purpose but is changed to plan, design, construct, furnish and equip infrastructure that directly supports film and digital media economic development in Las Cruces in Dona Ana county pursuant to the Local Economic Development Act. The time of expenditure is extended through fiscal year 2024.

     SECTION 56. LAS CRUCES PARKING GARAGE CONSTRUCTION--CHANGE TO LAS CRUCES INTERNATIONAL AIRPORT IMPROVEMENTS--EXTEND TIME--GENERAL FUND.--Up to six hundred thirty-two thousand eight hundred ninety dollars ($632,890) of the unexpended balance of the appropriation to the local government division in Subsection 203 of Section 34 of Chapter 277 of Laws 2019 to plan, design, construct and equip a parking garage in Las Cruces in Dona Ana county shall not be expended for the original purpose but is changed to plan, design, construct, furnish, equip and install improvements, including related infrastructure and landscaping, to the Las Cruces international airport in Dona Ana county. The time of expenditure is extended through fiscal year 2024.

     SECTION 57. DONA ANA INTERNATIONAL JETPORT RUNWAY 10-28--CHANGE TO DONA ANA INTERNATIONAL JETPORT RUNWAY PROJECT CONSTRUCTION--GENERAL FUND.--The unexpended balance of the appropriation to the department of transportation in Subsection 74 of Section 40 of Chapter 277 of Laws 2019 to plan, design and construct improvements to runway 10-28, including lighting, at the Dona Ana international jetport in Santa Teresa in Dona Ana county shall not be expended for the original purpose but is changed to plan, design and construct runway projects at the Dona Ana international jetport in Santa Teresa in Dona Ana county.

     SECTION 58. DONA ANA COUNTY VADO TRAIL IMPROVEMENTS--CHANGE TO VADO-DEL CERRO COMMUNITY CENTER EQUIPMENT AND FURNITURE--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 218 of Section 34 of Chapter 277 of Laws 2019 to acquire rights of way, easements and property and to plan, design and construct a restroom and water fountains for the Vado trail in Vado in Dona Ana county shall not be expended for the original purpose but is changed to purchase and install furniture and equipment at the Vado-Del Cerro community center in Vado. The time of expenditure is extended through fiscal year 2024.

     SECTION 59. MALAGA MUTUAL DOMESTIC WATER CONSUMERS AND SEWAGE WORKS ASSOCIATION TRUCK PURCHASE--CHANGE TO EXTEND WATER LINES--CHANGE AGENCY--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 191 of Section 29 of Chapter 138 of Laws 2021 to purchase and equip trucks, including emergency lights, for the Malaga mutual domestic water consumers and sewage works association in Eddy county shall not be expended for the original purpose but is appropriated to the department of transportation to plan, design, construct and extend water lines across a bridge on United States highway 285 over the Black river for that association in Eddy county. The time of expenditure is extended through fiscal year 2024.

     SECTION 60. MALAGA MUTUAL DOMESTIC WATER CONSUMERS AND SEWAGE WORKS ASSOCIATION BACKHOE PURCHASE--CHANGE TO EXTEND WATER LINES--CHANGE AGENCY--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 190 of Section 29 of Chapter 138 of Laws 2021 to purchase and equip a backhoe for the Malaga mutual domestic water consumers and sewage works association in Eddy county shall not be expended for the original purpose but is appropriated to the department of transportation to plan, design, construct and extend water lines across a bridge on United States highway 285 over the Black river for that association in Eddy county. The time of expenditure is extended through fiscal year 2024.

     SECTION 61. VAUGHN STREETS DRAINAGE DESIGN--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 38 of Section 32 of Chapter 80 of Laws 2018 to plan and design drainage improvements for streets in Vaughn in Guadalupe county is extended through fiscal year 2024.

     SECTION 62. EUNICE YOUTH SPORTS COMPLEX CONSTRUCT--CHANGE TO RODEO ARENA--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 220 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct and equip a youth sports complex, including baseball, softball, football and soccer fields, for Eunice in Lea county shall not be expended for the original purpose but is changed to plan, design, construct and furnish a covered rodeo arena, including a recreational vehicle park, landscaping, lighting, sidewalks, parking and fencing, in Eunice in Lea county. The time of expenditure is extended through fiscal year 2024.

     SECTION 63. LAS VEGAS CITY PUBLIC SCHOOL DISTRICT YOUTH CENTER CONSTRUCTION--CHANGE TO JAL WASTEWATER TREATMENT PLANT IMPROVEMENTS--CHANGE AGENCY--EXTEND TIME--SEVERANCE TAX BONDS.--Up to nine hundred thousand dollars ($900,000) of the unexpended balance of the appropriation to the public education department in Subsection 26 of Section 22 of Chapter 81 of Laws 2020 to acquire land and to plan, design, construct, renovate and equip a youth center for the Las Vegas city public school district in San Miguel county shall not be expended for the original purpose but is appropriated to the department of environment to plan, design, construct, upgrade and equip a wastewater treatment plant, including an area for land application of effluent water, in Jal in Lea county. The time of expenditure is extended through June 30, 2026.

     SECTION 64. LOVINGTON WELLS AND WATER SYSTEM CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project originally authorized in Subsection 19 of Section 11 of Chapter 64 of Laws 2012 to plan, design and construct wells in Lovington in Lea county and reauthorized in Laws 2016, Chapter 83, Section 52 and again in Laws 2018, Chapter 68, Section 66 to include purchase and installation of equipment for water wells and water system improvements in Lovington and again in Laws 2020, Chapter 82, Section 46 is extended through fiscal year 2024.

     SECTION 65. TATUM WATER SYSTEM IMPROVEMENTS--CHANGE TO WATER DISTRIBUTION SYSTEM IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the department of environment originally authorized in Subsection 36 of Section 26 of Chapter 81 of Laws 2020 and reauthorized in Laws 2021, Chapter 139, Section 38 to plan, design and construct improvements to the water distribution system and water storage facility, including the water tank, in Tatum in Lea county shall not be expended for the original or reauthorized purpose but is changed to plan, design and construct improvements to the water distribution and delivery system in Tatum. The time of expenditure is extended through fiscal year 2024.

     SECTION 66. RUIDOSO DOWNS SENIOR CENTER PLAN AND DESIGN--CHANGE TO RUIDOSO COMMUNITY CENTER PLAN AND DESIGN--CHANGE AGENCY--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the aging and long-term services department in Subsection 21 of Section 5 of Chapter 138 of Laws 2021 to plan and design the Ruidoso Downs senior center in Ruidoso Downs in Lincoln county shall not be expended for the original purpose but is appropriated to the local government division to plan and design the Ruidoso community center in Ruidoso in Lincoln county.

     SECTION 67. WHITE CLIFFS MUTUAL DOMESTIC WATER USERS ASSOCIATION WASTEWATER SYSTEM IMPROVEMENTS--CHANGE TO MCKINLEY COUNTY SHERIFF'S DEPARTMENT VEHICLE PURCHASE--CHANGE AGENCY--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the department of environment in Subsection 45 of Section 21 of Chapter 138 of Laws 2021 to plan, design, construct, purchase, equip and install water and wastewater system improvements for the White Cliffs mutual domestic water users association in McKinley county shall not be expended for the original purpose but is appropriated to the local government division to purchase and equip vehicles for the sheriff's department in McKinley county.

     SECTION 68. OJO ENCINO CHAPTER EAGLE SPRING POWERLINE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 23 of Section 20 of Chapter 81 of Laws 2016 and reauthorized in Laws 2020, Chapter 82, Section 59 to plan, design and construct the Eagle Spring powerline in the Ojo Encino chapter of the Navajo Nation in Sandoval and McKinley counties is extended through fiscal year 2024.

     SECTION 69. PUEBLO PINTADO CHAPTER POWERLINE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 14 of Section 20 of Chapter 81 of Laws 2016 and reauthorized in Laws 2020, Chapter 82, Section 51 to plan, design and construct a powerline in the Pueblo Pintado chapter of the Navajo Nation in McKinley county is extended through fiscal year 2024.

     SECTION 70. TOHATCHI CHAPTER POWERLINE EXTENSION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 16 of Section 20 of Chapter 81 of Laws 2016 and reauthorized in Laws 2020, Chapter 82, Section 54 to plan, design and construct powerline extensions in the Tohatchi chapter of the Navajo Nation in McKinley county is extended through fiscal year 2024.

     SECTION 71. COYOTE CANYON CHAPTER CEMETERY--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 12 of Section 22 of Chapter 80 of Laws 2018 to plan, design and construct a community cemetery, including water lines and power lines, in the Coyote Canyon chapter of the Navajo Nation in McKinley county is extended through fiscal year 2024.

     SECTION 72. LAKE VALLEY CHAPTER POWER LINE EXTENSION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 35 of Section 22 of Chapter 80 of Laws 2018 to plan, design and construct power line extensions in the Lake Valley chapter of the Navajo Nation in San Juan county is extended through fiscal year 2024.

     SECTION 73. NAHODISHGISH CHAPTER HOUSE ACCESSIBILITY IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 17 of Section 22 of Chapter 80 of Laws 2018 to plan, design and construct accessibility improvements at the chapter house of the Nahodishgish chapter of the Navajo Nation in McKinley county is extended through fiscal year 2024.

     SECTION 74. THOREAU SENIOR CENTER IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the aging and long-term services department project in Subsection 9 of Section 5 of Chapter 80 of Laws 2018 to plan, design and construct improvements, including roofing, parking lot and accessibility features, to the senior center in Thoreau in McKinley county is extended through fiscal year 2024.

     SECTION 75. TOHATCHI CHAPTER RED WILLOW FARM WATER AND POWER LINES CONSTRUCTION AND ROAD IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 17 of Section 20 of Chapter 81 of Laws 2016 and reauthorized in Laws 2017, Chapter 133, Section 66 to plan, design, construct and make improvements to water lines, power lines and roads for Red Willow farm in the Tohatchi chapter of the Navajo Nation in McKinley county and for which the time of expenditure was extended in Laws 2020, Chapter 82, Section 55 is extended through fiscal year 2024.

     SECTION 76. TOHATCHI CHAPTER WAREHOUSE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 19 of Section 22 of Chapter 80 of Laws 2018 to plan, design and construct a warehouse for the Tohatchi chapter of the Navajo Nation in McKinley county is extended through fiscal year 2024.

     SECTION 77. RAMAH CHAPTER SOLID WASTE TRANSFER STATION CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 6 of Section 22 of Chapter 80 of Laws 2018 to plan, design, purchase, construct, equip and install a solid waste transfer station, including a trash compactor dumpster, a trash bin and an operator building, in the Ramah chapter of the Navajo Nation in Cibola county is extended through fiscal year 2024.

     SECTION 78. SMITH LAKE CHAPTER PARKING LOT IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 18 of Section 22 of Chapter 80 of Laws 2018 to plan and design parking lots, including curbs and lighting, for the chapter complex at the Smith Lake chapter in the Navajo Nation in McKinley county is extended through fiscal year 2024.

     SECTION 79. COMMISSION FOR THE BLIND FACILITIES RENOVATION--CHANGE AGENCY--SEVERANCE TAX BONDS.--The agency for the commission for the blind project originally authorized in Laws 2021, Chapter 138, Section 7 to plan, design, construct, renovate, repair, furnish and equip facilities for the commission for the blind in Otero and Bernalillo counties is changed to the capital program fund.

     SECTION 80. OJO ENCINO CHAPTER RURAL ADDRESSING SYSTEM CONSTRUCTION--EXPAND PURPOSE--EXTEND TIME--SEVERANCE TAX BONDS.--The Indian affairs department project in Subsection 25 of Section 22 of Chapter 80 of Laws 2018 to plan, design and construct a rural addressing system, including house numbers and road signs, in the Ojo Encino chapter of the Navajo Nation in Sandoval and McKinley counties may include the acquisition of right-of-way permits and the purchase of equipment for the installation of sign posts and address posts in the Ojo Encino chapter of the Navajo Nation in Sandoval and McKinley counties. The time of expenditure is extended through fiscal year 2024.

     SECTION 81. NEW MEXICO MUSEUM OF ART RENOVATIONS AND IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the cultural affairs department project in Subsection 13 of Section 9 of Chapter 80 of Laws 2018 to plan, design and construct renovations and other improvements to the New Mexico museum of art in Santa Fe in Santa Fe county is extended through fiscal year 2024.

     SECTION 82. NEW MEXICO SCHOOL FOR THE BLIND AND VISUALLY IMPAIRED RESIDENTIAL COTTAGES AND INFRASTRUCTURE IMPROVEMENTS--EXTEND TIME--PUBLIC SCHOOL CAPITAL OUTLAY FUND.--The time of expenditure for the board of regents of the New Mexico school for the blind and visually impaired appropriation originally authorized in Subsection 3 of Section 45 of Chapter 66 of Laws 2014 to plan, design, construct, renovate, equip and furnish residential cottages, including the demolition of Sacramento dormitory, and to make other infrastructure improvements campuswide at the New Mexico school for the blind and visually impaired in Alamogordo in Otero county and reauthorized by Laws 2016, Chapter 83, Section 113 to clarify the funding source and for which the time of expenditure was extended in Laws 2018, Chapter 68, Section 87 is extended through fiscal year 2024.

     SECTION 83. CURRY AND OTERO COUNTIES CONTAMINATED WATER SYSTEM IMPROVEMENTS--CHANGE TO CLOUDCROFT WATER SYSTEM IMPROVEMENTS--SEVERANCE TAX BONDS.--Up to one million five hundred thousand dollars ($1,500,000) of the unexpended balance of the appropriation to the department of environment in Subsection 56 of Section 26 of Chapter 81 of Laws 2020 to plan, design and construct improvements to contaminated water systems in Curry and Otero counties shall not be expended for the original purpose but is changed to plan, design, construct and improve contaminated water systems in Cloudcroft in Otero county.

     SECTION 84. ACEQUIA DE LOS SALAZARES IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the interstate stream commission project in Subsection 9 of Section 25 of Chapter 80 of Laws 2018 to plan, design and construct improvements, including water control structures, for the acequia de Los Salazares in Rio Arriba county is extended through fiscal year 2024.

     SECTION 85. JICARILLA APACHE NATION COMMUNITY GARDEN OFFICE AND STORAGE UNIT CONSTRUCTION--CHANGE TO COMMUNITY GARDEN PROJECT CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the Indian affairs department in Subsection 29 of Section 22 of Chapter 80 of Laws 2018 to purchase, construct and install a community garden storage unit and office for the Jicarilla Apache Nation in Dulce in Rio Arriba county shall not be expended for the original purpose but is changed to plan, design, construct and equip a community garden project for the Jicarilla Apache Nation. The time of expenditure is extended through fiscal year 2024.

     SECTION 86. PLAZA BLANCA MUTUAL DOMESTIC WATER CONSUMERS' ASSOCIATION RIO DE CHAMA WATER LINE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 67 of Section 26 of Chapter 81 of Laws 2020 to plan, design, construct, repair and replace a water line of the Rio de Chama for the Plaza Blanca mutual domestic water consumers' association in Rio Arriba county is extended through fiscal year 2024.

     SECTION 87. ABIQUIU MUTUAL DOMESTIC WATER CONSUMERS ASSOCIATION AND MUTUAL SEWAGE WORKS ASSOCIATION WASTEWATER FACILITY IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 62 of Section 26 of Chapter 81 of Laws 2020 to plan, design and construct improvements to the wastewater treatment facility for the Abiquiu mutual domestic water consumers association and mutual sewage works association in Rio Arriba county is extended through fiscal year 2024.

     SECTION 88. CANJILON MUTUAL DOMESTIC WATER CONSUMERS' AND MUTUAL SEWAGE WORKS ASSOCIATION IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 35 of Section 20 of Chapter 80 of Laws 2018 to plan, design and construct water system improvements for the Canjilon mutual domestic water consumers' and mutual sewage works association in Rio Arriba county is extended through fiscal year 2024.

     SECTION 89. CHAMA CITY HALL COMPLEX CONSTRUCTION--EXPAND PURPOSE--EXTEND TIME--SEVERANCE TAX BONDS.--The local government division project in Subsection 139 of Section 26 of Chapter 80 of Laws 2018 to plan, design, construct, furnish and equip a city hall complex in Chama in Rio Arriba county may include renovation. The time of expenditure is extended through fiscal year 2024.

     SECTION 90. CHAMA CITY HALL COMPLEX CONSTRUCTION--EXPAND PURPOSE--SEVERANCE TAX BONDS.--The local government division project in Subsection 315 of Section 35 of Chapter 81 of Laws 2020 to plan, design, construct, furnish and equip a city hall complex in Chama in Rio Arriba county may include renovation.

     SECTION 91. ESPANOLA MUNICIPAL COURT COMMUNITY OUTREACH PROGRAM GREENHOUSE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 318 of Section 35 of Chapter 81 of Laws 2020 to plan, design, construct, purchase and install a greenhouse for the municipal court community outreach program in Espanola in Rio Arriba county is extended through fiscal year 2024.

     SECTION 92. ACEQUIA DE LOS CHAVEZ IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the interstate stream commission project in Subsection 8 of Section 25 of Chapter 80 of Laws 2018 to plan, design and construct improvements, including piping, to the acequia de los Chavez in Petaca in Rio Arriba county is extended through fiscal year 2024.

     SECTION 93. LOS OJOS FISH HATCHERY WASTEWATER IMPROVEMENTS--CHANGE AGENCY--SEVERANCE TAX BONDS.--The department of environment project in Subsection 74 of Section 26 of Chapter 81 of Laws 2020 to plan, design and construct improvements to infrastructure for the hatchery outflow to meet drinking water standards in the area of Los Ojos in Rio Arriba county is appropriated to the department of game and fish for that purpose.

     SECTION 94. LAS VEGAS CITY PUBLIC SCHOOL DISTRICT YOUTH CENTER CONSTRUCTION--CHANGE TO ROOSEVELT COUNTY ARCH FIRE DISTRICT FIRE TRUCKS--CHANGE AGENCY.--Up to three hundred seventy-five thousand dollars ($375,000) of the unexpended balance of the appropriation to the public education department in Subsection 26 of Section 22 of Chapter 81 of Laws 2020 to acquire land and to plan, design, construct, renovate and equip a youth center for the Las Vegas city public school district in San Miguel county shall not be expended for the original purpose but is appropriated to the local government division to purchase and equip fire trucks for the Arch fire district in Roosevelt county.

     SECTION 95. ROOSEVELT COUNTY SPECIAL HOSPITAL DISTRICT EMERGENCY ROOM EXPANSION--CHANGE TO RENOVATE OFFICE AND PATIENT CARE SPACE--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 339 of Section 34 of Chapter 277 of Laws 2019 to plan, design, construct, equip and expand an emergency room at Roosevelt general hospital in the Roosevelt county special hospital district in Roosevelt county shall not be expended for the original purpose but is changed to plan, design, construct and renovate office and patient care space at Roosevelt general hospital in the Roosevelt county special hospital district. The time of expenditure is extended through fiscal year 2024.

     SECTION 96. ROOSEVELT GENERAL HOSPITAL EQUIPMENT PURCHASE--CHANGE TO RENOVATE OFFICE AND PATIENT CARE SPACE--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 331 of Section 35 of Chapter 81 of Laws 2020 to purchase, replace and upgrade operating room, clinic and acute medical care and surgical equipment for the Roosevelt county special hospital district in Roosevelt county shall not be expended for the original purpose but is changed to plan, design, construct and renovate office and patient care space at Roosevelt general hospital in the Roosevelt county special hospital district. The time of expenditure is extended through fiscal year 2024.

     SECTION 97. PORTALES ROOSEVELT COUNTY DETENTION CENTER KITCHEN AND LAUNDRY RENOVATION AND EQUIPMENT PURCHASE--EXPAND PURPOSE--EXTEND TIME--GENERAL FUND.--The local government division project in Subsection 338 of Section 34 of Chapter 277 of Laws 2019 to plan, design and renovate kitchen and laundry areas, including replacement of kitchen and laundry equipment, at the Roosevelt county detention center in Portales in Roosevelt county may include replacement and repair of heating, ventilation and air conditioning systems. The time of expenditure is extended through fiscal year 2024.

     SECTION 98. LAS VEGAS CITY PUBLIC SCHOOL DISTRICT YOUTH CENTER CONSTRUCTION--CHANGE TO ROOSEVELT COUNTY HEALTH CLINIC IMPROVEMENTS--CHANGE AGENCY--EXTEND TIME--SEVERANCE TAX BONDS.--Up to one hundred twenty-five thousand dollars ($125,000) of the unexpended balance of the appropriation to the public education department in Subsection 26 of Section 22 of Chapter 81 of Laws 2020 to acquire land and to plan, design, construct, renovate and equip a youth center for the Las Vegas city public school district in San Miguel county shall not be expended for the original purpose but is appropriated to the local government division to plan, design and construct a parking lot and stucco upgrades for a county health clinic in Portales in Roosevelt county. The time of expenditure is extended through fiscal year 2026.

     SECTION 99. SAN JUAN COUNTY ROAD 5500 BRIDGE REPLACEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 56 of Section 32 of Chapter 80 of Laws 2018 to plan, design, construct and replace a bridge over the San Juan river on county road 5500 in San Juan county is extended through fiscal year 2024.

     SECTION 100. SHIPROCK CHAPTER WASTEWATER SYSTEM AND EXTENSION CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project originally authorized in Subsection 59 of Section 18 of Chapter 81 of Laws 2016 and reauthorized in Laws 2020, Chapter 82, Section 74 to acquire rights of way and easements and to plan, design and construct a wastewater system and extension south of Shiprock in the Navajo Nation in San Juan county and appropriated to the Indian affairs department in Laws 2021, Chapter 139, Section 64 for that purpose is extended through fiscal year 2024.

     SECTION 101. EAST AZTEC ARTERIAL ROUTE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project originally authorized in Subsection 63 of Section 25 of Chapter 66 of Laws 2014 to construct the east Aztec arterial route in Aztec in San Juan county and for which the time of expenditure was extended in Laws 2018, Chapter 68, Section 98 and reauthorized in Laws 2020, Chapter 82, Section 70 to include planning and designing is extended through fiscal year 2024.

     SECTION 102. FARMINGTON FIRE DEPARTMENT EXTRICATION EQUIPMENT--EXTEND TIME--GENERAL FUND.--The time of expenditure for the local government division project in Subsection 47 of Section 72 of Chapter 81 of Laws 2020 to purchase extrication equipment for the fire department in Farmington in San Juan county is extended through fiscal year 2024.

     SECTION 103. SAN JUAN COLLEGE DOOR LOCK SYSTEM PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the higher education department project in Subsection 3 of Section 33 of Chapter 80 of Laws 2018 to plan, design, purchase and install an electronic door lock system at San Juan college in Farmington in San Juan county is extended through fiscal year 2024.

     SECTION 104. NENAHNEZAD CHAPTER MULTIPURPOSE BUILDING ROOF RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 36 of Section 22 of Chapter 80 of Laws 2018 to plan, design, construct and renovate the roof on the multipurpose building in the Nenahnezad chapter of the Navajo Nation in San Juan county is extended through fiscal year 2024.

     SECTION 105. SAN JUAN COUNTY RADIO INFRASTRUCTURE AND EQUIPMENT IMPROVEMENTS--TIME EXTEND--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 333 of Section 35 of Chapter 81 of Laws 2020 to replace and upgrade radio infrastructure and equipment for San Juan county is extended through fiscal year 2024.

     SECTION 106. NAGEEZI CHAPTER ELECTRIC POWERLINE EXTENSION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 33 of Section 20 of Chapter 81 of Laws 2016 and reauthorized in Laws 2020, Chapter 82, Section 73 to construct the Kinnadiz and Pillow Crest electrical powerline extension project in the Nageezi chapter of the Navajo Nation in San Juan county is extended through fiscal year 2024.

     SECTION 107. ACEQUIA DE LOS SEGURAS IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the interstate stream commission project in Subsection 15 of Section 25 of Chapter 80 of Laws 2018 to plan, design and construct improvements, including bank stabilization, to the acequia de los Seguras in San Miguel county is extended through fiscal year 2024.

     SECTION 108. LUNA COMMUNITY COLLEGE MILLING MACHINE PURCHASE--CHANGE TO LUNA COMMUNITY COLLEGE MILLING MACHINE LABORATORY EQUIPMENT PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the higher education department in Subsection 15 of Section 39 of Chapter 81 of Laws 2020 to purchase a computer numerical control milling machine for Luna community college in Las Vegas in San Miguel county shall not be expended for the original purpose but is changed to purchase equipment for the computer numerical control milling machine laboratory at Luna community college. The time of expenditure is extended through fiscal year 2024.

     SECTION 109. RIO GALLINAS SCHOOL SECURITY AND TECHNOLOGY PURCHASE--EXTEND TIME--GENERAL FUND.--The time of expenditure for the public education department project in Subsection 195 of Section 63 of Chapter 81 of Laws 2020 to purchase and install a security system and technology upgrades, including security cameras, intercom and viewboards, for the Rio Gallinas school of ecology and the arts charter school in Las Vegas in San Miguel county is extended through fiscal year 2024.

     SECTION 110. JEMEZ PUEBLO POWER AND WATER LINES CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 40 of Section 20 of Chapter 81 of Laws 2016 and reauthorized in Laws 2020, Chapter 82, Section 81 to plan, design and construct power and water lines in the Pueblo of Jemez in Sandoval county is extended through fiscal year 2024.

     SECTION 111. ELDORADO HIKE-BIKE TRAIL NETWORK EXTENSION--CHANGE TO ELDORADO HIKE-BIKE TRAILS CONSTRUCTION--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 397 of Section 34 of Chapter 277 of Laws 2019 to plan, design and construct an extension to the Eldorado hike-bike network along avenida El Dorado, from avenida Torreon to the intersection with United States highway 285, in Eldorado in Santa Fe county shall not be expended for the original purpose but is changed to plan, design and construct hike-bike trails in the Eldorado area in Santa Fe county. The time of expenditure is extended through fiscal year 2024.

     SECTION 112. RIO EN MEDIO ALTO DITCH IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the interstate stream commission project in Subsection 26 of Section 25 of Chapter 80 of Laws 2018 to plan, construct and install improvements to the Alto ditch for the Rio en Medio ditch association in Santa Fe county is extended through fiscal year 2024.

     SECTION 113. ELDORADO FIRE STATION 4 IMPROVEMENTS--CHANGE TO IMPROVEMENTS TO FIRE STATIONS IN THE ELDORADO FIRE DISTRICT--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division originally authorized in Subsection 193 of Section 22 of Chapter 81 of Laws 2016 and reauthorized in Laws 2019, Chapter 280, Section 89 to make improvements to comply with the federal Americans with Disabilities Act of 1990 and to plan, design and construct improvements and restorations to the exterior and surrounding areas, including parking lots and trailheads, of fire station 4 in Eldorado in Santa Fe county and the time for which was extended in Laws 2021, Chapter 139, Section 74 shall not be expended for its original or reauthorized purpose but is changed to plan, design, construct, equip and furnish improvements to fire stations in the Eldorado fire district in Santa Fe county. The time of expenditure is extended through fiscal year 2024.

     SECTION 114. SANTA FE COUNTY ELDORADO SUBDIVISION TRAILS CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 165 of Section 26 of Chapter 80 of Laws 2018 to plan, design and construct trails in the Eldorado subdivision in Santa Fe county is extended through fiscal year 2024.

     SECTION 115. SANTA FE COUNTY RECOVERY PROGRAM FACILITY EXPANSION--CHANGE TO PURCHASE OF LAND AND BUILDINGS AND RENOVATE FACILITY--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 334 of Section 29 of Chapter 138 of Laws 2021 to plan, design and construct an expansion to a facility for a recovery program in Santa Fe county shall not be expended for the original purpose but is changed to purchase land and buildings and to plan, design, construct, renovate, furnish and equip a facility for a recovery program in Santa Fe county.

     SECTION 116. SANTA FE COUNTY RECOVERY PROGRAM BUILDING IMPROVEMENTS--EXPAND PURPOSE--EXTEND TIME--GENERAL FUND.--The local government division project in Subsection 386 of Section 34 of Chapter 277 of Laws 2019 to plan, design, construct, renovate, furnish and equip a facility for a recovery program in Santa Fe county may include the purchase of land and buildings. The time of expenditure is extended through fiscal year 2024.

     SECTION 117. TESUQUE PUEBLO BACKHOE PURCHASE--CHANGE TO SEWER JETTER TRUCK--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the Indian affairs department in Subsection 115 of Section 25 of Chapter 138 of Laws 2021 to purchase and equip a backhoe for the Pueblo of Tesuque in Santa Fe county shall not be expended for the original purpose but is changed to purchase and equip a sewer jetter truck for the Pueblo of Tesuque. The time of expenditure is extended through fiscal year 2024.

     SECTION 118. SANTA FE COUNTY MADRID FIRE STATION CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project originally authorized in Subsection 195 of Section 22 of Chapter 81 of Laws 2016 and reauthorized in Laws 2020, Chapter 82, Section 92 to plan, design, construct and equip improvements to the fire station in Madrid in Santa Fe county is extended through fiscal year 2024.

     SECTION 119. NAMBE PUEBLO ADMINISTRATION BUILDING CONSTRUCTION--CHANGE TO NAMBE PUEBLO ECONOMIC DEVELOPMENT COOPERATIVE ADMINISTRATION BUILDING--EXTEND TIME--GENERAL FUND.--Up to five hundred thousand dollars ($500,000) of the unexpended balance of the appropriation to the Indian affairs department in Subsection 122 of Section 31 of Chapter 277 of Laws 2019 to plan, design and construct an administration building at the Pueblo of Nambe in Santa Fe county shall not be expended for the original purpose but is changed to plan, design and construct an administration building for the economic development cooperative at the Pueblo of Nambe. The time of expenditure is extended through fiscal year 2024.

     SECTION 120. FIRST JUDICIAL DISTRICT ATTORNEY'S OFFICE SECURITY SYSTEMS AND EQUIPMENT PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the office of the first judicial district attorney project in Laws 2020, Chapter 81, Section 12 to purchase, equip and install telecommunications systems, security systems, information technology, furniture and office equipment, including partitions and fixtures, in the first judicial district court in Santa Fe in Santa Fe county is extended through fiscal year 2024.

     SECTION 121. ADMINISTRATIVE OFFICE OF THE COURTS MAGISTRATE AND DISTRICT COURTS SECURITY EQUIPMENT PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the administrative office of the courts project in Laws 2018, Chapter 80, Section 3 to purchase and install security systems and for technology upgrades to security systems at magistrate courts and judicial district courts statewide is extended through fiscal year 2024.

     SECTION 122. NEW MEXICO HIGHWAY 14 SAFETY IMPROVEMENTS--CHANGE TO SANTA FE CHILDREN'S MUSEUM IMPROVEMENTS--CHANGE AGENCY--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the department of transportation in Subsection 60 of Section 32 of Chapter 80 of Laws 2018 to purchase, install and construct safety improvements to New Mexico highway 14 in Santa Fe county shall not be expended for the original purpose but is appropriated to the cultural affairs department to plan, design, construct, renovate, equip and furnish the Santa Fe children's museum in Santa Fe in Santa Fe county. The time of expenditure is extended through fiscal year 2024.

     SECTION 123. SANTA FE COUNTY RECOVERY CENTER EXPANSION--CHANGE TO PURCHASE LAND AND BUILDINGS--EXTEND TIME--SEVERANCE TAX BONDS.--The local government division project in Subsection 385 of Section 35 of Chapter 81 of Laws 2020 to plan, design and construct an expansion to a facility for a recovery program in Santa Fe county shall not be expended for the original purpose but is changed to purchase land and buildings and to plan, design, construct, renovate, furnish and equip a facility for a recovery program in Santa Fe county.

     SECTION 124. SANTA FE STATE POLICE DISTRICT OFFICE CONSTRUCTION--EXTEND TIME--CAPITOL BUILDINGS REPAIR FUND.--The time of expenditure for the capital program fund project in Laws 2018, Chapter 80, Section 54 to plan, design, construct, renovate, furnish and equip a new state police district office in Santa Fe in Santa Fe county is extended through fiscal year 2024.

     SECTION 125. OIL CONSERVATION DIVISION ARTESIA DISTRICT OFFICE SITE IMPROVEMENTS--CHANGE AGENCY--CHANGE PURPOSE--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the energy, minerals and natural resources department originally authorized in Subsection 1 of Section 15 of Chapter 81 of Laws 2016 for site improvements and to plan, design, construct, equip and furnish the oil conservation division district office in Artesia in Eddy county and reauthorized to the capital program fund in Laws 2017, Chapter 133, Section 45 for that purpose and for which the time of expenditure was extended in Laws 2020, Chapter 82, Section 43 shall not be expended for its original purpose but is reauthorized to the state parks division of the energy, minerals and natural resources department to plan, design and construct upgrades and improvements to state parks related to water and wastewater infrastructure statewide. The time of expenditure is extended through fiscal year 2024.

     SECTION 126. SUPREME COURT BUILDING IMPROVEMENTS--EXTEND TIME--CAPITOL BUILDINGS REPAIR FUND.--The time of expenditure for the supreme court building commission project in Laws 2018, Chapter 80, Section 55 from the capitol buildings repair fund to plan, design, construct and renovate facilities, including abatement and remediation of the exterior courtyard stucco, at the supreme court building in Santa Fe in Santa Fe county is extended through fiscal year 2024.

     SECTION 127. VETERANS' SERVICES DEPARTMENT VETERAN CEMETERIES AND MONUMENTS SAFETY IMPROVEMENTS--CHANGE AGENCY--SEVERANCE TAX BONDS.--The agency for the veterans' services department project originally authorized in Laws 2021, Chapter 138, Section 43 to plan, design, construct, improve, repair, furnish and equip and make improvements, including safety and security infrastructure, at veteran cemeteries and monuments statewide is changed to the capital program fund.

     SECTION 128. VIETNAM VETERANS MEMORIAL ANGEL FIRE IMPROVEMENTS--CHANGE AGENCY--SEVERANCE TAX BONDS.--The agency for the veterans' services department project originally authorized in Laws 2020, Chapter 82, Section 47 to plan, design, construct, repair, furnish, equip and make site improvements, including a memorial wall, at the Vietnam veterans memorial in Angel Fire in Colfax county is changed to the capital program fund.

     SECTION 129. SPACEPORT AUTHORITY SPACEPORT LAUNCH VEHICLE PAYLOAD INTEGRATION FACILITY CONSTRUCTION--CHANGE TO ROCKET ASSEMBLY TESTING FACILITIES INSTALLATION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the spaceport authority in Subsection 2 of Section 31 of Chapter 80 of Laws 2018 to plan, design and construct a launch vehicle payload integration facility at spaceport America in Sierra county shall not be expended for the original purpose but is changed to plan, design, construct and install rocket assembly, testing and related facilities at the spaceport. The time of expenditure is extended through fiscal year 2024.

     SECTION 130. SPACEPORT AMERICA INFRASTRUCTURE UPGRADES--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the spaceport authority project in Subsection 1 of Section 31 of Chapter 80 of Laws 2018 to plan, design, repair, construct, furnish and equip infrastructure upgrades, including electrical, fire suppression, water, sewer, security, mission control, heating, ventilation and air conditioning and building systems, at spaceport America facilities in Sierra county is extended through fiscal year 2024.

     SECTION 131. SPACEPORT FUEL FARM INSTALLATION--EXPAND PURPOSE--EXTEND TIME--SEVERANCE TAX BONDS.--The spaceport authority project in Subsection 3 of Section 31 of Chapter 80 of Laws 2018 to perform environmental studies and to plan, design, construct and equip a fuel farm, including fencing and security systems, at spaceport America in Sierra county may include planning and designing expansions, including physical upgrades and improvements to systems, facilities and utilities, at the spaceport. The time of expenditure is extended through fiscal year 2024.

     SECTION 132. NEW MEXICO INSTITUTE OF MINING AND TECHNOLOGY KELLY AND GOLD BUILDINGS AND WORKMAN CENTER ROOFS--EXPAND PURPOSE--GENERAL FUND.--The board of regents of the New Mexico institute of mining and technology project in Subsection 2 of Section 45 of Chapter 277 of Laws 2019 to plan, design, construct and renovate roofs on the Kelly building, the Gold building and Workman center at the New Mexico institute of mining and technology in Socorro in Socorro county may include roof replacements campuswide.

     SECTION 133. CORRECTIONS DEPARTMENT STATE CORRECTIONAL FACILITIES STATEWIDE MASTER PLAN--EXTEND TIME--CAPITAL PROGRAM FUND.--The time of expenditure for the capital program fund project originally authorized in Laws 2018, Chapter 80, Section 40 and reauthorized in Laws 2019, Chapter 280, Section 109 to develop a master plan, including planning for a new correctional facility, for state correctional facilities statewide is extended through fiscal year 2024.

     SECTION 134. DEPARTMENT OF MILITARY AFFAIRS LAND PURCHASE SANDOVAL COUNTY--CHANGE TO DEPARTMENT OF MILITARY AFFAIRS FACILITIES RENOVATION STATEWIDE.--The unexpended balance of the appropriation to the department of military affairs in Subsection 1 of Section 36 of Chapter 81 of Laws 2020 to acquire land to serve as a buffer zone for the Rio Rancho military training site in Rio Rancho in Sandoval county shall not be expended for the original purpose but is changed to plan, design, construct, purchase, renovate, furnish and install equipment and infrastructure, including energy-efficiency systems, to correct deficiencies at the department of military affairs facilities statewide.

     SECTION 135. ENERGY, MINERALS AND NATURAL RESOURCES DEPARTMENT OIL CONSERVATION DIVISION VEHICLE PURCHASE--EXTEND TIME--OIL AND GAS RECLAMATION FUND.--The time of expenditure for the oil conservation division of the energy, minerals and natural resources department project in Subsection 2 of Section 91 of Chapter 81 of Laws 2020 to purchase and equip vehicles for the oil conservation division statewide is extended through fiscal year 2024.

     SECTION 136. DEPARTMENT OF GAME AND FISH HABITAT RESTORATION AND STATE GAME COMMISSION PROPERTY IMPROVEMENT--EXTEND TIME--GAME PROTECTION FUND.--The time of expenditure for the department of game and fish project in Subsection 3 of Section 50 of Chapter 80 of Laws 2018 for fisheries renovation and wildlife and riparian habitat restoration and for improvements at properties owned by the state game commission statewide is extended through fiscal year 2024.

     SECTION 137. MAGISTRATE COURTS SECURITY SYSTEM PHASE 3 STATEWIDE UPGRADES--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the administrative office of the courts project in Subsection 4 of Section 4 of Chapter 81 of Laws 2020 to upgrade proprietary security and camera systems to enterprise-class information technology security and camera systems in magistrate courts statewide is extended through fiscal year 2024.

     SECTION 138. MAINSTREET DISTRICTS STATEWIDE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the economic development department project in Laws 2018, Chapter 80, Section 15 to plan, design and construct infrastructure improvements in mainstreet districts statewide is extended through fiscal year 2024. 

     SECTION 139. NEW MEXICO ACEQUIA COMMISSION STATEWIDE IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the interstate stream commission project originally authorized in Subsection 21 of Section 21 of Chapter 81 of Laws 2016 to plan, design and construct improvements to acequias statewide for the New Mexico acequia commission and reauthorized in Laws 2020, Chapter 82, Section 112 is extended through fiscal year 2024.

     SECTION 140. PECOS RIVER SETTLEMENT LAND AND WATER RIGHTS PURCHASE--EXTEND TIME--ATTORNEY GENERAL SETTLEMENT FUND.--The time of expenditure for the interstate stream commission project originally authorized in Subsection 1 of Section 37 of Chapter 66 of Laws 2014 to purchase land and water rights within the interstate stream commission's existing pricing guidelines and for the development of augmentation well fields and pipelines and related professional services for the Pecos River Compact settlement for which the time of expenditure was extended in Laws 2018, Chapter 68, Section 130 and reauthorized in Laws 2020, Chapter 82, Section 57 is extended through fiscal year 2024.

     SECTION 141. OFFICE OF THE STATE ENGINEER DAM REHABILITATION STATEWIDE--EXTEND TIME--WATER PROJECT FUND.--The time of expenditure for the office of the state engineer project in Subsection 1 of Section 43 of Chapter 80 of Laws 2018 to plan, design, construct, rehabilitate and make phase 2 improvements at Morphy lake dam in Mora county and for improvements to publicly owned dams statewide is extended through fiscal year 2024.

     SECTION 142. TAOS COUNTY FIRE DEPARTMENT TRUCK AND EQUIPMENT PURCHASE--CHANGE TO TAOS COUNTY FIRE DEPARTMENT APPARATUS AND PROTECTIVE EQUIPMENT PURCHASE--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 354 of Section 29 of Chapter 138 of Laws 2021 to purchase and equip wildland trucks for the Cerro and San Cristobal fire departments, including rope equipment for a county rescue truck, in Taos county shall not be expended for the original purpose but is changed to purchase protective equipment and apparatus equipment for the Taos county fire department in Taos county.

     SECTION 143. ARROYO HONDO SEPTIC SYSTEM IMPROVEMENTS--CHANGE TO RENOVATION OF A COMMUNITY CENTER--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the department of environment in Subsection 124 of Section 26 of Chapter 277 of Laws 2019 to plan, design and construct septic system improvements in Arroyo Hondo in Taos county shall not be expended for the original purpose but is appropriated to the local government division to plan, design, construct, renovate and equip a community center, including bathroom and kitchen additions, in Arroyo Hondo. The time of expenditure is extended through fiscal year 2024.

     SECTION 144. OJO CALIENTE MUTUAL DOMESTIC WATER CONSUMERS ASSOCIATION IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 70 of Section 20 of Chapter 80 of Laws 2018 to plan, design and construct water system improvements for the Ojo Caliente mutual domestic water consumers association in Taos county is extended through fiscal year 2024.

     SECTION 145. TAOS COUNTY VETERANS' CEMETERY CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 177 of Section 26 of Chapter 80 of Laws 2018 to plan, design and construct a veterans' cemetery in Taos county is extended through fiscal year 2024.

     SECTION 146. TAOS REGIONAL AIRPORT PARKING LOT IMPROVEMENTS--CHANGE AGENCY--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division in Subsection 357 of Section 29 of Chapter 138 of Laws 2021 to plan, design, construct and renovate the parking lot at the Taos regional airport in Taos county shall not be expended for the original purpose but is appropriated to the department of transportation to plan, design, construct and improve the entrance road and the parking lot at the Taos regional airport.

     SECTION 147. WILLARD WASTEWATER SYSTEM--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 77 of Section 20 of Chapter 80 of Laws 2018 to plan, design and construct wastewater system improvements in Willard in Torrance county is extended through fiscal year 2024.

     SECTION 148. VALENCIA COUNTY RAILROAD QUIET ZONES CONSTRUCTION--EXPAND PURPOSE--EXTEND TIME--SEVERANCE TAX BONDS.--The department of transportation project in Subsection 21 of Section 38 of Chapter 81 of Laws 2020 to plan, design and construct a railroad quiet zone on Los Lentes road and Luscombe lane in Los Lunas in Valencia county may include planning, designing and constructing a railroad quiet zone on Gabaldon road in Belen in Valencia county. The time of expenditure is extended through fiscal year 2024.

     SECTION 149. CUMBRES AND TOLTEC SCENIC RAILROAD COMMISSION PROJECT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Cumbres and Toltec scenic railroad commission project in Section 10 of Chapter 80 of Laws 2018 for track rehabilitation and related infrastructure improvements, including locomotive and boiler upgrades to comply with federal railroad administration standards, and for improvements to passenger cars for the Cumbres and Toltec scenic railroad operating between New Mexico and Colorado, is extended through fiscal year 2024.

     SECTION 150. EMERGENCY.--It is necessary for the public peace, health and safety that this act take effect immediately.

- 60 -