HOUSE TAXATION AND REVENUE COMMITTEE SUBSTITUTE FOR

HOUSE BILL 355

54th legislature - STATE OF NEW MEXICO - second session, 2020

 

 

 

 

 

 

 

AN ACT

RELATING TO CAPITAL EXPENDITURES; REAUTHORIZING OR REAPPROPRIATING BALANCES, EXPANDING OR CHANGING PURPOSES, EXTENDING EXPENDITURE PERIODS, CHANGING AGENCIES AND ESTABLISHING CONDITIONS FOR THE REVERSION OR TRANSFER OF UNEXPENDED BALANCES OF APPROPRIATIONS MADE BY THE LEGISLATURE IN PRIOR YEARS; DECLARING AN EMERGENCY.

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF NEW MEXICO:

     SECTION 1. SEVERANCE TAX BONDS--REVERSION OF PROCEEDS.--

          A. Except as otherwise provided in another section of this act:

                (1) the unexpended balance from the proceeds of severance tax bonds issued for a project that has been reauthorized in this act shall revert to the severance tax bonding fund:

                     (a) at the end of the expenditure period as set forth in this act, if the expenditure period is changed in this act; or

                     (b) if the expenditure period is not changed in this act, pursuant to the time frame set forth in the law that originally authorized the severance tax bonds or the time frame set forth in any law that has previously reauthorized the expenditure of the proceeds, whichever is later; and

                (2) all remaining balances from the proceeds of severance tax bonds issued for a project that has been reauthorized in this act shall revert to the severance tax bonding fund three months after the reversion date for the unexpended balances.

          B. For the purpose of this section, "unexpended balance" means the remainder of an appropriation after reserving for unpaid costs and expenses covered by binding written obligations to third parties.

     SECTION 2. GENERAL FUND AND OTHER FUND APPROPRIATIONS--REVERSIONS.--

          A. Except as otherwise provided in another section of this act:

                (1) the unexpended balance of an appropriation from the general fund or other state fund that has been changed in this act shall revert:

                     (a) at the end of the expenditure period as set forth in this act, if the expenditure period is changed in this act; or

                     (b) if the expenditure period is not changed in this act, pursuant to the time frame set forth in the law in which the original appropriation was made or the time frame set forth in any law that has previously changed the appropriation, whichever is later; and

                (2) all remaining balances of an appropriation from the general fund or other state fund that has been changed in this act shall revert three months after the reversion date for the unexpended balance.

          B. Except as provided in Subsection C of this section, the balance of an appropriation made from the general fund or other state fund shall revert pursuant to Subsection A of this section to the originating fund.

          C. The balance of an appropriation made from the general fund or other state fund to the Indian affairs department or the aging and long-term services department for a project located on lands of an Indian nation, tribe or pueblo shall revert pursuant to Subsection A of this section to the tribal infrastructure project fund.

          D. For the purpose of this section, "unexpended balance" means the remainder of an appropriation after reserving for unpaid costs and expenses covered by binding written obligations to third parties.

     SECTION 3. PASEO DEL VOLCAN LOOP BYPASS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project originally authorized in Subsection 57 of Section 25 of Chapter 66 of Laws 2014 to acquire rights of way for and to plan, design and construct the paseo del Volcan loop bypass road from Unser boulevard to interstate highway 40 in Bernalillo and Sandoval counties and for which the time of expenditure was extended in Laws 2018, Chapter 68, Section 3 is extended through fiscal year 2022.

     SECTION 4. PASEO DEL VOLCAN RIGHTS OF WAY ACQUISITION IN BERNALILLO AND SANDOVAL COUNTIES--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 1 of Section 24 of Chapter 81 of Laws 2016 to acquire rights of way and to design and construct paseo del Volcan, also known as New Mexico highway 347, in Sandoval and Bernalillo counties is extended through fiscal year 2022.

     SECTION 5. ROUTE 66 VISITORS CENTER ON WEST CENTRAL AVENUE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project originally authorized in Subsection 17 of Section 22 of Chapter 66 of Laws 2014 and reauthorized in Laws 2018, Chapter 68, Section 11 to purchase, plan, construct, furnish and equip a Route 66 visitors center on west Central avenue in Bernalillo county is extended through fiscal year 2022.

     SECTION 6. SOUTH VALLEY ECONOMIC DEVELOPMENT CENTER IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project originally authorized in Subsection 18 of Section 22 of Chapter 66 of Laws 2014 and reauthorized in Laws 2018, Chapter 68, Section 12 to plan, design, construct, equip and furnish improvements and additions to the South Valley economic development center in Bernalillo county is extended through fiscal year 2022.

     SECTION 7. SECOND JUDICIAL DISTRICT COURT HIGH-DENSITY FILE STORAGE UNITS PURCHASE--CHANGE TO PURCHASE EQUIPMENT AND FOR RENOVATIONS TO THE FIRST THROUGH THIRD FLOORS OF THE SECOND JUDICIAL DISTRICT COURTHOUSE--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the second judicial district court project in Laws 2018, Chapter 80, Section 14 to purchase and install high-density file storage units and to purchase related equipment for the second judicial district court shall not be used for the original purpose but is changed for security equipment, renovations and structural alterations and to purchase fixed and mobile equipment, furnishings and technology for the renovation of the first through third floors of the second judicial district courthouse in Albuquerque in Bernalillo county. The time of expenditure is extended through fiscal year 2022.

     SECTION 8. ALBUQUERQUE BIOPARK JAGUAR EXHIBIT CONSTRUCT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project originally authorized in Subsection 25 of Section 22 of Chapter 66 of Laws 2014 and reauthorized in Laws 2018, Chapter 68, Section 15 to design and construct a jaguar exhibit at the biopark in Albuquerque in Bernalillo county is extended through fiscal year 2022.

     SECTION 9. ALBUQUERQUE EXPLORA SCIENCE CENTER AND CHILDREN'S MUSEUM LEARNING CENTER CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 21 of Section 22 of Chapter 81 of Laws 2016 to plan, design, construct, equip and furnish phase 1 of Explora's cradle to career learning center and to purchase and install exhibits, furnishings and equipment for the Explora science center and children's museum in Albuquerque in Bernalillo county is extended through fiscal year 2022.

     SECTION 10. ALBUQUERQUE GUN VIOLENCE MEMORIAL--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the cultural affairs department project in Subsection 1 of Section 8 of Chapter 81 of Laws 2016 to plan, design, construct and install a memorial to gun violence victims in Albuquerque in Bernalillo county is extended through fiscal year 2022.

     SECTION 11. TRUMBULL AVENUE AND SAN PEDRO DRIVE STREET LIGHTS INSTALLATION--CHANGE TO ALBUQUERQUE INTERNATIONAL DISTRICT STREET LIGHTS INSTALLATION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the department of transportation originally authorized in Subsection 17 of Section 25 of Chapter 66 of Laws 2014 and reauthorized in Laws 2018, Chapter 68, Section 34 to purchase and install street lights along Trumbull avenue SE and San Pedro drive SE in Albuquerque in Bernalillo county shall not be expended for the original purpose but is changed to purchase and install street lights in the International district in Albuquerque. The time of expenditure is extended through fiscal year 2022.

     SECTION 12. ALBUQUERQUE ASIAN AND PACIFIC ISLANDER SHELTER CONSTRUCTION--CHANGE TO COMMUNITY CENTER CONSTRUCTION--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 31 of Section 34 of Chapter 277 of Laws 2019 to plan, design and construct a shelter for victims of domestic violence and survivors of sexual assault among the Asian and Pacific Islander population in Albuquerque in Bernalillo county shall not be expended for the original purpose but is changed to plan, design and construct a city-owned community center inclusive of the cultural needs of the Asian and Pacific Islander population in Albuquerque.

     SECTION 13. ALBUQUERQUE MOBILE VIDEO TRAILER PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 33 of Section 26 of Chapter 80 of Laws 2018 to purchase mobile video trailers for Albuquerque in Bernalillo county is extended through fiscal year 2022.

     SECTION 14. ALBUQUERQUE SIGN LANGUAGE ACADEMY CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the public education department project in Subsection 1 of Section 14 of Chapter 81 of Laws 2016 to plan, design and construct a facility for the Albuquerque sign language academy in Albuquerque in Bernalillo county is extended through fiscal year 2022.

     SECTION 15. AMY BIEHL HIGH SCHOOL ASBESTOS AND LEAD PAINT ABATEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the public education department project in Subsection 2 of Section 14 of Chapter 81 of Laws 2016 for asbestos and lead paint abatement and to plan, design, construct and renovate the basement at Amy Biehl high school in Albuquerque in Bernalillo county is extended through fiscal year 2022.

     SECTION 16. ATRISCO HERITAGE ACADEMY HIGH SCHOOL ACCESS ROAD CONSTRUCTION--EXPAND PURPOSE--EXTEND TIME--SEVERANCE TAX BONDS.--The department of transportation project in Subsection 7 of Section 24 of Chapter 81 of Laws 2016 to plan, design and construct an access road to Atrisco Heritage academy high school, including driveways, trail connections and modifications to Senator Dennis Chavez boulevard and to 118th street, in Albuquerque in Bernalillo county may include sidewalks and signal modifications. The time of expenditure is extended through fiscal year 2022.

     SECTION 17. BERNALILLO COUNTY ASIAN AMERICAN MONUMENT CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 45 of Section 22 of Chapter 81 of Laws 2016 to plan, design, landscape and construct an Asian American monument in Albuquerque in Bernalillo county is extended through fiscal year 2022.

     SECTION 18. BERNALILLO COUNTY ROUTE 66 VISITOR CENTER ON WEST CENTRAL AVENUE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 52 of Section 22 of Chapter 81 of Laws 2016 to acquire land for and to plan, design, construct, purchase, furnish and equip a route 66 visitor center on west Central avenue in Albuquerque in Bernalillo county is extended through fiscal year 2022.

     SECTION 19. LOS PUENTES CHARTER SCHOOL PORTABLE BUILDING CONSTRUCTION--CHANGE TO LOS PUENTES CHARTER SCHOOL CONSTRUCTION AND EQUIPPING OF BUILDINGS AND GROUNDS AND INSTALLATION OF INFRASTRUCTURE--GENERAL FUND.--The unexpended balance of the appropriation to the public education department in Subsection 117 of Section 20 of Chapter 277 of Laws 2019 to plan, design, construct, improve, equip and furnish a portable classroom building at Los Puentes charter school in the Albuquerque public school district in Bernalillo county shall not be expended for the original purpose but is changed to plan, design, construct, renovate, furnish and equip buildings and grounds and install related equipment, fencing, education and information technology, wiring, paving and infrastructure for Los Puentes charter school in Albuquerque in Bernalillo county.

     SECTION 20. NATIONAL HISPANIC CULTURAL CENTER INFORMATION AND WELCOME CENTER CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the cultural affairs department project originally authorized in Subsection 3 of Section 7 of Chapter 66 of Laws 2014 to plan, design, construct, equip and furnish an information and welcome center at the entrance of the national Hispanic cultural center in Albuquerque in Bernalillo county and for which the time of expenditure was extended in Laws 2018, Chapter 68, Section 33 is extended through fiscal year 2021.

     SECTION 21. SOUTH VALLEY PREPARATORY SCHOOL PORTABLES PURCHASE--EXPAND PURPOSE--SEVERANCE TAX BONDS.--The public education department project in Subsection 13 of Section 16 of Chapter 80 of Laws 2018 to acquire land and to plan, design, construct, purchase, equip and install portable classrooms at the South Valley preparatory school in Albuquerque in Bernalillo county may include planning, designing, renovating, equipping, furnishing and purchasing buildings and equipment for that school.

     SECTION 22. UNIVERSITY OF NEW MEXICO ECONOMIC DEVELOPMENT MULTIPURPOSE EVENTS CENTER RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the board of regents of the university of New Mexico project in Subsection 1 of Section 13 of Chapter 81 of Laws 2016 to plan, design, construct and renovate a former church building as a multipurpose events center for a cooperative economic development project between Innovate ABQ, incorporated, and the university of New Mexico in Albuquerque in Bernalillo county is extended through fiscal year 2022.

     SECTION 23. HIGHLAND HIGH SCHOOL OUTDOOR ADVENTURE CLUB VAN PURCHASE--CHANGE TO HIGHLAND HIGH SCHOOL AND ALBUQUERQUE PUBLIC SCHOOL DISTRICT OUTDOOR TRAILER PURCHASE--EXTEND TIME--GENERAL FUND.--The unexpended balance of the public education department project in Subsection 94 of Section 20 of Chapter 277 of Laws 2019 to purchase and equip an activity van for Highland high school in the Albuquerque public school district in Bernalillo county shall not be expended for the original purpose but is changed to purchase and equip a trailer and outdoor education equipment for Highland high school and throughout the Albuquerque public school district in Bernalillo county. The time of expenditure is extended through fiscal year 2022.

     SECTION 24. MARY ANN BINFORD ELEMENTARY SCHOOL TRACK AREA IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the public education department project in Subsection 111 of Section 14 of Chapter 81 of Laws 2016 to plan, design, renovate and construct improvements to the grounds, fields and track areas, including the purchase and installation of related equipment, furniture and landscaping, at Mary Ann Binford elementary school in the Albuquerque public school district in Bernalillo county is extended through fiscal year 2022.

     SECTION 25. ROBERT F. KENNEDY CHARTER SCHOOL LEARNING LABORATORY EQUIPMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the public education department project in Subsection 116 of Section 16 of Chapter 80 of Laws 2018 to purchase and install equipment for a virtual learning laboratory at Robert F. Kennedy charter school in the Albuquerque public school district in Bernalillo county is extended through fiscal year 2022.

     SECTION 26. ROBERT F. KENNEDY CHARTER SCHOOL INFORMATION TECHNOLOGY PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the public education department project in Subsection 115 of Section 16 of Chapter 80 of Laws 2018 to purchase and install information technology, including related equipment, furniture and infrastructure, at Robert F. Kennedy charter school in the Albuquerque public school district in Bernalillo county is extended through fiscal year 2022.

     SECTION 27. ROBERT F. KENNEDY CHARTER SCHOOL LEARNING LABORATORY EQUIPMENT PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project originally authorized in Subsection 62 of Section 22 of Chapter 66 of Laws 2014 for a community center in the Westgate community in Albuquerque in Bernalillo county and appropriated to the public education department in Laws 2018, Chapter 68, Section 36 to purchase and install equipment for a virtual learning laboratory at Robert F. Kennedy charter school in the Albuquerque public school district in Bernalillo county is extended through fiscal year 2022.

     SECTION 28. TO'HAJIILEE CHAPTER SKATEBOARD AND RECREATIONAL PARK PLANNING, DESIGN AND CONSTRUCTION--CHANGE TO PURCHASE BACKHOE--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the Indian affairs department in Subsection 2 of Section 20 of Chapter 81 of Laws 2016 to plan, design and construct a skateboard and recreational park, including purchase and installation of furnishings and equipment, in the To'hajiilee chapter of the Navajo Nation in Bernalillo county shall not be expended for the original purpose but is changed to purchase a backhoe for the To'hajiilee chapter. The time of expenditure is extended through fiscal year 2022.

     SECTION 29. DEXTER WATER SYSTEM IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project originally authorized in Subsection 5 of Section 18 of Chapter 81 of Laws 2016 and reauthorized in Laws 2018, Chapter 68, Section 38 to plan, design and construct water system improvements, including wells, water supply lines and water treatment, in Dexter in Chaves county is extended through fiscal year 2022.

     SECTION 30. CIBOLA COUNTY HEAVY EQUIPMENT PURCHASE--EXPAND PURPOSE--GENERAL FUND.--The local government division project in Subsection 150 of Section 34 of Chapter 277 of Laws 2019 to purchase and equip heavy equipment, including a skidsteer, for Cibola county may include purchasing and equipping vehicles and other equipment.

     SECTION 31. ACOMA PUEBLO WASTEWATER TREATMENT FACILITY IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 6 of Section 18 of Chapter 81 of Laws 2016 to plan, design and construct expansions and upgrades to the North Acomita wastewater treatment facility at the Pueblo of Acoma in Cibola county is extended through fiscal year 2022.

     SECTION 32. RAMAH CHAPTER SOLID WASTE TRANSFER STATION PLANNING, DESIGN AND CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 6 of Section 20 of Chapter 81 of Laws 2016 to plan, design and construct a solid waste transfer station, including a trash compactor dumpster, a trash bin and an operator building, in the Ramah chapter of the Navajo Nation in Cibola county is extended through fiscal year 2022.

     SECTION 33. ANGEL FIRE WATER STORAGE TANKS CONSTRUCTION AND REPAIR--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 7 of Section 18 of Chapter 81 of Laws 2016 to plan, design, construct and repair water storage tanks in Angel Fire in Colfax county is extended through fiscal year 2022.

     SECTION 34. MINERS' HOSPITAL LONG-TERM CARE FACILITY ELECTRICAL AND MECHANICAL SYSTEM IMPROVEMENTS--EXPAND PURPOSE--EXTEND TIME--MINERS' TRUST FUND.--The miners' Colfax medical center project in Subsection 3 of Section 39 of Chapter 81 of Laws 2016 to plan, design, construct, renovate, equip and furnish mechanical and electrical system upgrades and improvements at the center's long-term care facility in Colfax county may include upgrades and improvements at the center's acute care facility. The time of expenditure is extended through fiscal year 2022.

     SECTION 35. EASTERN NEW MEXICO FOOD BANK LIGHTING IMPROVEMENTS--EXPAND PURPOSE--GENERAL FUND.--The local government division project in Subsection 164 of Section 34 of Chapter 277 of Laws 2019 to plan, design, construct and install improvements to lighting at a food bank for eastern New Mexico in Clovis in Curry county may include planning, designing and constructing improvements, including paving and a parking lot, at the food bank.

     SECTION 36. CLOVIS RAILROAD DISTRICT ATCHISON, TOPEKA AND SANTA FE LOCOMOTIVE REPAIRING AND RESTORATION--EXPAND PURPOSE--EXTEND TIME--SEVERANCE TAX BONDS.--The local government division project in Subsection 76 of Section 22 of Chapter 81 of Laws 2016 to repair and restore the Atchison, Topeka and Santa Fe 9005 locomotive in the railroad district in Clovis in Curry county may include repairing and restoring a caboose. The time of expenditure is extended through fiscal year 2022.

     SECTION 37. BOSQUE REDONDO MEMORIAL IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the cultural affairs department project in Subsection 4 of Section 8 of Chapter 81 of Laws 2016 to plan, design, construct, landscape and improve the Bosque Redondo memorial at the Fort Sumner historic site in De Baca county is extended through fiscal year 2022.

     SECTION 38. DONA ANA COUNTY RADIUM SPRINGS FIRE STATION 8 CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 89 of Section 22 of Chapter 81 of Laws 2016 to plan, design and construct improvements to Radium Springs fire station 8 in Dona Ana county is extended through fiscal year 2022.

     SECTION 39. LOWER RIO GRANDE PUBLIC WATER WORKS AUTHORITY MINI-EXCAVATOR PURCHASE--EXPAND PURPOSE--GENERAL FUND.--The department of environment project in Subsection 24 of Section 26 of Chapter 277 of Laws 2019 to purchase and equip a mini-excavator for the lower Rio Grande public water works authority in Dona Ana county may include purchasing and equipping excavators and mini-excavators.

     SECTION 40. LOWER RIO GRANDE PUBLIC WATER WORKS AUTHORITY WATER LINE CONSTRUCTION--EXPAND PURPOSE--GENERAL FUND.--The department of environment project in Subsection 23 of Section 26 of Chapter 277 of Laws 2019 to plan, design and construct a water line extension on Jacquez road from Three Saints road to the end of Jacquez road in the lower Rio Grande public water works authority service area in Dona Ana county may include planning, designing and constructing water system improvements in the lower Rio Grande public water works authority south valley service area in the Vado, Del Cerro, Berino and Bosque communities in Dona Ana county.

     SECTION 41. LAS CRUCES FILM FACILITY AND INFRASTRUCTURE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project originally authorized in Subsection 104 of Section 22 of Chapter 66 of Laws 2014 and reauthorized in Laws 2015, Chapter 147, Section 24 and for which the time of expenditure was extended in Laws 2018, Chapter 68, Section 52 to plan, design, construct, furnish and equip a facility and related infrastructure to be owned by Las Cruces in Dona Ana county for film, digital media and entertainment arts production is extended through fiscal year 2022.

     SECTION 42. SUNLAND PARK STREETS AND DRAINAGE IMPROVEMENT CONSTRUCTION--CHANGE TO CONSTRUCT INDUSTRIAL AVENUE OVERPASS--EXTEND TIME--SEVERANCE TAX BONDS.--Up to forty-nine percent of the unexpended balance of the appropriation to the department of transportation in Subsection 39 of Section 24 of Chapter 81 of Laws 2016 to plan, design, purchase, construct and install street and drainage improvements, including information technology for street pavement management and related equipment, furniture and infrastructure, for Sunland park in Dona Ana county shall not be expended for the original purpose but is changed to acquire rights of way and to plan, design and construct an overpass for Industrial avenue in Santa Teresa in Dona Ana county. The time of expenditure is extended through fiscal year 2022.

     SECTION 43. OIL CONSERVATION DIVISION ARTESIA DISTRICT OFFICE SITE IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the energy, minerals and natural resources department project originally authorized in Subsection 1 of Section 15 of Chapter 81 of Laws 2016 for site improvements and to plan, design, construct, equip and furnish the oil conservation division district office in Artesia in Eddy county and reauthorized to the capital program fund in Laws 2017, Chapter 133, Section 45 for that purpose is extended through fiscal year 2022.

     SECTION 44. LOVING SEWER COLLECTION AND WASTEWATER SYSTEM IMPROVEMENTS--EXPAND PURPOSE--EXTEND TIME--SEVERANCE TAX BONDS.--The department of environment project in Subsection 22 of Section 18 of Chapter 81 of Laws 2016 to plan, design and construct sewer collection system improvements in Loving in Eddy county may include wastewater system improvements. The time of expenditure is extended through fiscal year 2022.

     SECTION 45. POWER LAKE DAM IMPROVE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the office of the state engineer project originally authorized in Subsection 6 of Section 15 of Chapter 66 of Laws 2014 and reauthorized in Laws 2018, Chapter 68, Section 64 to plan, design, renovate and construct improvements to the Power Lake dam in Guadalupe county is extended through fiscal year 2022.

     SECTION 46. LOVINGTON WELLS AND WATER SYSTEM CONSTRUCTION AND IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project originally authorized in Subsection 19 of Section 11 of Chapter 64 of Laws 2012 to plan, design and construct wells in Lovington in Lea county and reauthorized in Laws 2016, Chapter 83, Section 52 and again in Laws 2018, Chapter 68, Section 66 to include purchase and installation of equipment for water wells and water system improvements in Lovington is extended through fiscal year 2022.

     SECTION 47. THOREAU CHAPTER VETERANS' SERVICE CENTER CONSTRUCTION--CHANGE TO COUNTY ROAD 6 IMPROVEMENTS IN MCKINLEY COUNTY--CHANGE AGENCY--EXTEND TIME--SEVERANCE TAX BONDS.--Up to fifty-nine thousand four hundred dollars ($59,400) of the unexpended balance of the appropriation to the local government division in Subsection 138 of Section 22 of Chapter 81 of Laws 2016 to plan, design, construct and equip the veterans' service center in the Thoreau chapter of the Navajo Nation in McKinley county shall not be expended for the original purpose but is appropriated to the department of transportation to plan, design, construct and improve county road 6 in the Chichiltah chapter of the Navajo Nation in McKinley county. The time of expenditure is extended through fiscal year 2022.

     SECTION 48. MCKINLEY COUNTY ADOLESCENT RECOVERY CENTER CONSTRUCTION--CHANGE TO PURCHASE OF HEAVY EQUIPMENT FOR ROAD DEPARTMENT--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 287 of Section 34 of Chapter 277 of Laws 2019 to plan, design and construct an adolescent recovery center in Gallup in McKinley county shall not be expended for the original purpose but is changed to purchase and equip heavy equipment for the road department in McKinley county.

     SECTION 49. CASAMERO LAKE CHAPTER POWER LINE CONSTRUCTION--CHANGE TO SENIOR CENTER CONSTRUCTION--CHANGE AGENCY--GENERAL FUND.--The unexpended balance of the Indian affairs department project in Subsection 24 of Section 31 of Chapter 277 of Laws 2019 to acquire rights of way and easements for and to plan, design and construct power line extensions, including archaeological and environmental studies, in the Casamero Lake chapter in the Navajo Nation in McKinley county shall not be expended for the original purpose but is appropriated to the aging and long-term services department to plan, design and construct a senior center in that chapter.

     SECTION 50. NAVAJO FACILITY RENOVATION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 20 of Section 25 of Chapter 3 of Laws 2015 (1st S.S.) and reauthorized to the local government division in Laws 2018, Chapter 68, Section 73 to plan, design, construct and renovate a facility in Navajo in McKinley county is extended through fiscal year 2022.

     SECTION 51. PUEBLO PINTADO CHAPTER POWERLINE CONSTRUCT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 14 of Section 20 of Chapter 81 of Laws 2016 to plan, design and construct a powerline in the Pueblo Pintado chapter of the Navajo Nation in McKinley county is extended through fiscal year 2022.

     SECTION 52. NORTH CHAPEL HILL ROAD ROCK SPRINGS CHAPTER IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 50 of Section 33 of Chapter 3 of Laws 2015 (1st S.S.) and reauthorized in Laws 2018, Chapter 68, Section 75 to plan, design and construct improvements to north Chapel Hill road in the Rock Springs chapter of the Navajo Nation in McKinley county is extended through fiscal year 2022.

     SECTION 53. THOREAU CHAPTER VETERANS' SERVICE CENTER CONSTRUCTION--CHANGE TO THOREAU CHAPTER VETERANS' SERVICE CENTER EQUIPMENT PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--Up to eleven thousand dollars ($11,000) of the unexpended balance of the appropriation to the Indian affairs department originally authorized in Subsection 38 of Section 20 of Chapter 81 of Laws 2016 and reauthorized in Laws 2017, Chapter 133, Section 62 to plan, design and construct a veterans' service center in the Thoreau chapter of the Navajo Nation in McKinley county shall not be expended for the original or reauthorized purpose but is changed to equip the veterans' service center in the Thoreau chapter of the Navajo Nation in McKinley county. The time of expenditure is extended through fiscal year 2022.

     SECTION 54. TOHATCHI CHAPTER POWERLINE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 16 of Section 20 of Chapter 81 of Laws 2016 to plan, design and construct powerline extensions in the Tohatchi chapter of the Navajo Nation in McKinley county is extended through fiscal year 2022.

     SECTION 55. TOHATCHI CHAPTER RED WILLOW FARM WATER AND POWER LINES CONSTRUCTION AND ROAD IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project originally authorized in Subsection 17 of Section 20 of Chapter 81 of Laws 2016 to plan, design and construct a water well and system improvements to Red Willow farm in the Tohatchi chapter of the Navajo Nation in McKinley county and reauthorized in Laws 2017, Chapter 133, Section 66 to plan, design, construct and make improvements to water lines, power lines and roads for Red Willow farm in the Tohatchi chapter is extended through fiscal year 2022.

     SECTION 56. UPPER HOLMAN MUTUAL DOMESTIC WATER CONSUMERS AND MUTUAL SEWAGE WORKS ASSOCIATION FLUORIDE TREATMENT FACILITY CONSTRUCTION--CHANGE TO INSTALL WATER SYSTEM IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the department of environment originally authorized in Subsection 148 of Section 16 of Chapter 66 of Laws 2014 to plan, design and construct a fluoride treatment facility for the upper Holman community mutual domestic water consumers and mutual sewage works association in Holman in Mora county and reauthorized in Laws 2016, Chapter 83, Section 65 to include land acquisition and for which the time of expenditure was extended in Laws 2018, Chapter 68, Section 78 shall not be expended for the original or reauthorized purpose but is changed to plan, design, construct, purchase, equip and install water system improvements, including fluoride treatment, water lines, radio read water meters and meter reading technology, for the association. The time of expenditure is extended through fiscal year 2022.

     SECTION 57. PECOS RIVER SETTLEMENT LAND AND WATER RIGHTS PURCHASE--EXTEND TIME--ATTORNEY GENERAL SETTLEMENT FUND.--The time of expenditure for the interstate stream commission project originally authorized in Subsection 1 of Section 37 of Chapter 66 of Laws 2014 to purchase land and water rights within the interstate stream commission's existing pricing guidelines and for the development of augmentation well fields and pipelines and related professional services for the Pecos River Compact settlement and for which the time of expenditure was extended in Laws 2018, Chapter 68, Section 130 is extended through fiscal year 2022.

     SECTION 58. CRYSTAL CHAPTER WATER TANK AND FIRE PUMP PURCHASE AND INSTALLATION--EXTEND TIME--SEVERANCE TAX BONDS.-- The time of expenditure for the Indian affairs department project originally authorized in Subsection 32 of Section 20 of Chapter 81 of Laws 2016 and reauthorized in Laws 2017, Chapter 133, Section 74 to purchase and install a water storage tank and fire pump in the Crystal chapter of the Navajo Nation in San Juan and McKinley counties is extended through fiscal year 2022.

     SECTION 59. OJO ENCINO CHAPTER EAGLE SPRING POWERLINE PLANNING, DESIGN AND CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 23 of Section 20 of Chapter 81 of Laws 2016 to plan, design and construct the Eagle Spring powerline in the Ojo Encino chapter of the Navajo Nation in Sandoval and McKinley counties is extended through fiscal year 2022.

     SECTION 60. NEW MEXICO MUSEUM OF SPACE HISTORY RESTROOM RENOVATIONS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the cultural affairs department project in Subsection 7 of Section 8 of Chapter 81 of Laws 2016 to plan, design and renovate the restrooms, including accessibility improvements, at the New Mexico museum of space history in Alamogordo in Otero county is extended through fiscal year 2021.

     SECTION 61. NEW MEXICO SCHOOL FOR THE BLIND AND VISUALLY IMPAIRED QUIMBY GYMNASIUM, NATATORIUM AND INFRASTRUCTURE IMPROVEMENTS--EXTEND TIME--PUBLIC SCHOOL CAPITAL OUTLAY FUND.--The time of expenditure for the board of regents of the New Mexico school for the blind and visually impaired project originally authorized in Subsection 2 of Section 45 of Chapter 66 of Laws 2014 to plan, design, construct, renovate, equip and furnish the Quimby gymnasium and natatorium and to make other infrastructure improvements campuswide at the New Mexico school for the blind and visually impaired in Alamogordo in Otero county and reauthorized in Laws 2016, Chapter 83, Section 113 to clarify the funding source and for which the time of expenditure was extended in Laws 2018, Chapter 68, Section 86 is extended through fiscal year 2022.

     SECTION 62. NEW MEXICO SCHOOL FOR THE BLIND AND VISUALLY IMPAIRED RESIDENTIAL COTTAGES AND INFRASTRUCTURE IMPROVEMENTS--EXTEND TIME--PUBLIC SCHOOL CAPITAL OUTLAY FUND.--The time of expenditure for the board of regents of the New Mexico school for the blind and visually impaired appropriation originally authorized in Subsection 3 of Section 45 of Chapter 66 of Laws 2014 to plan, design, construct, renovate, equip and furnish residential cottages, including the demolition of Sacramento dormitory, and to make other infrastructure improvements campuswide at the New Mexico school for the blind and visually impaired in Alamogordo in Otero county and reauthorized by Laws 2016, Chapter 83, Section 113 to clarify the funding source and for which the time of expenditure was extended in Laws 2018, Chapter 68, Section 87 is extended through fiscal year 2022.

     SECTION 63. RIO ARRIBA COUNTY RESIDENTIAL TREATMENT FACILITY CONSTRUCTION--CHANGE TO WOMEN-AND-CHILDREN-FOCUSED RESIDENTIAL TREATMENT FACILITY PURCHASE AND CONSTRUCTION--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 335 of Section 34 of Chapter 277 of Laws 2019 to plan, design, construct, renovate and equip a residential recovery facility in Velarde in Rio Arriba county shall not be expended for the original purpose but is changed to purchase, engineer, construct, renovate, improve, equip and furnish facilities, property and roads for a women-and-children-focused residential recovery facility in Rio Arriba county.

     SECTION 64. RIO ARRIBA COUNTY SALA FILANTROPICA RENOVATION--CHANGE TO RIO ARRIBA COUNTY OFFICE VEHICLE PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the local government division originally appropriated in Subsection 159 of Section 22 of Chapter 66 of Laws 2014 and for which the time of expenditure was extended in Laws 2018, Chapter 68, Section 90 to renovate, furnish and expand the Sala Filantropica building into a multipurpose community facility in the Embudo valley in Rio Arriba county shall not be expended for the original purpose but is changed to purchase and equip vehicles for the offices of the county manager, county assessor and county health commons in Rio Arriba county. The time of expenditure is extended through fiscal year 2022.

     SECTION 65. RIO ARRIBA COUNTY MOBILE STAGE FOR EMBUDO VALLEY LIBRARY--CHANGE TO ECONOMIC DEVELOPMENT PROJECT FOR AN OUTDOOR STAGE AND TO REMODEL BUILDINGS--CHANGE AGENCY--GENERAL FUND.--The unexpended balance of the appropriation to the local government division in Subsection 313 of Section 34 of Chapter 277 of Laws 2019 to purchase and equip a mobile performing arts stage in Rio Arriba county shall not be expended for the original purpose but is appropriated to the economic development department for an economic development project to build an outdoor stage and renovate buildings at the Embudo valley library in Rio Arriba county.

     SECTION 66. PIEDRA LUMBRE VISITORS CENTER PURCHASE--EXPAND PURPOSE--GENERAL FUND.--The department of finance and administration project in Subsection 2 of Section 28 of Chapter 277 of Laws 2019 to acquire the Piedra Lumbre visitors center from the United States forest service for the San Joaquin del Rio de Chama, Juan Bautista Baldez and Tierra Amarilla land grants-mercedes in Rio Arriba county may include planning, designing, renovating, repairing, constructing, furnishing and equipping, abatement and removal of asbestos, lead-based paint and other hazardous materials and demolition and disposal of existing structures at the visitors center.

     SECTION 67. EASTERN NEW MEXICO UNIVERSITY PRESIDENT'S RESIDENCE AND PUBLIC EVENT VENUE CONSTRUCT AND RENOVATE--EXPAND PURPOSE--GENERAL FUND.--The board of regents of eastern New Mexico university project in Subsection 12 of Section 42 of Chapter 277 of Laws 2019 to construct a president's residence and public event venue for eastern New Mexico university in Portales in Roosevelt county may include the purchase of land and buildings and planning, design and renovations.

     SECTION 68. NAVAJO NATION EXCAVATOR PURCHASE--CHANGE AGENCY--EXTEND TIME--SEVERANCE TAX BONDS.--The agency for the Indian affairs department project originally authorized in Subsection 31 of Section 22 of Chapter 80 of Laws 2018 to purchase and equip an excavator for irrigation systems on the Navajo Nation in San Juan county is changed to the local government division. The time of expenditure for the project is extended through fiscal year 2022.

     SECTION 69. SAN JUAN COUNTY REGIONAL WATER SYSTEMS CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project originally authorized in Subsection 55 of Section 18 of Chapter 81 of Laws 2016 and reauthorized in Laws 2017, Chapter 133, Section 90 to plan, design and construct regional water systems in San Juan county is extended through fiscal year 2022.

     SECTION 70. EAST AZTEC ARTERIAL ROUTE CONSTRUCTION--EXPAND PURPOSE--EXTEND TIME--SEVERANCE TAX BONDS.--The department of transportation project originally authorized in Subsection 63 of Section 25 of Chapter 66 of Laws 2014 and for which the time of expenditure was extended in Laws 2018, Chapter 68, Section 98 to construct the east Aztec arterial route in Aztec in San Juan county may include planning and design for that route. The time of expenditure is extended through fiscal year 2022.

     SECTION 71. BLOOMFIELD ALTERNATE WATER SUPPLY DIVERSION CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 57 of Section 18 of Chapter 81 of Laws 2016 to plan, design and construct an alternate water supply diversion in Bloomfield in San Juan county is extended through fiscal year 2022.

     SECTION 72. VILLA VIEW DETENTION PONDS FACILITY CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the office of the state engineer project in Subsection 2 of Section 17 of Chapter 81 of Laws 2016 to acquire land for and to plan, design and construct the Villa View detention ponds facility in Farmington in San Juan county is extended through fiscal year 2022.

     SECTION 73. NAGEEZI CHAPTER KINNADIZ AND PILLOW CREST POWERLINE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 33 of Section 20 of Chapter 81 of Laws 2016 to construct the Kinnadiz and Pillow Crest electrical powerline extension project in the Nageezi chapter of the Navajo Nation in San Juan county is extended through fiscal year 2022.

     SECTION 74. SHIPROCK CHAPTER WASTEWATER SYSTEM CONSTRUCTION AND EXTENSION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 59 of Section 18 of Chapter 81 of Laws 2016 to acquire rights of way and easements and to plan, design and construct a wastewater system and extension south of Shiprock in the Navajo Nation in San Juan county is extended through fiscal year 2022.

     SECTION 75. TWO GREY HILLS CHAPTER VETERANS' MEMORIAL PARK CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 38 of Section 20 of Chapter 81 of Laws 2016 to plan, design, construct and equip a veterans' memorial park and modular facility, including fencing, in the Two Grey Hills chapter of the Navajo Nation in San Juan county is extended through fiscal year 2022.

     SECTION 76. NEW MEXICO BEHAVIORAL HEALTH INSTITUTE NEW MEADOWS BUILDING PHASE 3 IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the capital program fund project in Subsection 8 of Section 7 of Chapter 81 of Laws 2016 to plan, design, construct, furnish and equip phase 3 of the new Meadows building and for infrastructure improvements at the New Mexico behavioral health institute in Las Vegas in San Miguel county is extended through fiscal year 2021.

     SECTION 77. VILLANUEVA DAVID F. CARGO LIBRARY ROOF IMPROVEMENT--CHANGE TO MULTI-USE FACILITY PLANNING--CHANGE AGENCY--GENERAL FUND.--The unexpended balance of the appropriation to the cultural affairs department in Subsection 11 of Section 9 of Chapter 277 of Laws 2019 to plan, design, construct, furnish and equip improvements, including the roof, to the David F. Cargo library in Villanueva in San Miguel county shall not be expended for the original purpose but is appropriated to the economic development department for planning an economic development project to plan, develop, repair, construct and improve an existing library and community center in Villanueva to create a multi-use facility to include library, educational, retail and traditional cultural activities and community programs.

     SECTION 78. CORONADO HISTORIC SITE RUINS FOOTPRINT CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the cultural affairs department project in Subsection 8 of Section 8 of Chapter 81 of Laws 2016 to plan, design and construct the ruins footprint at the Coronado historic site in Sandoval county is extended through fiscal year 2022.

     SECTION 79. PASEO DEL VOLCAN RIGHTS OF WAY ACQUISITION FROM UNSER BOULEVARD TO THE BERNALILLO-SANDOVAL COUNTY LINE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 61 of Section 24 of Chapter 81 of Laws 2016 to purchase rights of way for paseo del Volcan from Unser boulevard to the Bernalillo-Sandoval county line is extended through fiscal year 2022.

     SECTION 80. COCHITI PUEBLO EARLY CHILDHOOD DEVELOPMENT FACILITY CONSTRUCTION--CHANGE TO MULTIPURPOSE BUILDING CONSTRUCTION--GENERAL FUND.--The unexpended balance of the appropriation to the Indian affairs department in Subsection 99 of Section 31 of Chapter 277 of Laws 2019 to plan, design, construct, purchase, equip, install and furnish an early childhood development facility, including safety doors, playground equipment, site improvements and fencing, for the Pueblo of Cochiti in Sandoval county shall not be expended for the original purpose but is changed to plan, design, construct, renovate, furnish and equip a multipurpose building for that pueblo.

     SECTION 81. JEMEZ PUEBLO ADOBE PRODUCTION BUILDING CONSTRUCTION--CHANGE TO POWER AND WATER LINE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The unexpended balance of the appropriation to the Indian affairs department in Subsection 40 of Section 20 of Chapter 81 of Laws 2016 to plan, design and construct a metal building, including a concrete pad, for adobe production in the Pueblo of Jemez in Sandoval county shall not be expended for the original purpose but is changed to plan, design and construct power and water lines in the Pueblo of Jemez. The time of expenditure is extended through fiscal year 2022.

     SECTION 82. JEMEZ PUEBLO WALATOWA CHILD CARE CENTER ROOF AND STUCCO REPAIR--CHANGE TO JEMEZ PUEBLO WELCOME CENTER REPAIR--GENERAL FUND.--The unexpended balance of the appropriation to the Indian affairs department in Subsection 105 of Section 31 of Chapter 277 of Laws 2019 to plan, design, construct, repair and replace the stucco and roof of the Walatowa child care center in the Pueblo of Jemez in Sandoval county shall not be expended for the original purpose but is changed to repair and replace roofing, stucco and structural damage at the welcome center at that pueblo.

     SECTION 83. JEMEZ SPRINGS GEOTHERMAL HEATING SYSTEM PLANNING AND DESIGN--EXPAND PURPOSE--EXTEND TIME--SEVERANCE TAX BONDS.--The local government division project in Subsection 181 of Section 22 of Chapter 81 of Laws 2016 to plan and design a geothermal heating system for village facilities in Jemez Springs in Sandoval county may include construction. The time of expenditure is extended through fiscal year 2022.

     SECTION 84. LINCOLN AVENUE ACQUISITION OF RIGHTS OF WAY AND CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 62 of Section 24 of Chapter 81 of Laws 2016 to acquire rights of way for and to plan, design and construct a Lincoln avenue extension from Adams lane to paseo del Volcan in Rio Rancho in Sandoval county is extended through fiscal year 2022.

     SECTION 85. SAN FELIPE PUEBLO RIO GRANDE SOUTH BRIDGE DESIGN--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project originally authorized in Subsection 74 of Section 25 of Chapter 66 of Laws 2014 and reauthorized in Laws 2018, Chapter 68, Section 111 to design a south bridge over the Rio Grande in the Pueblo of San Felipe in Sandoval county is extended through fiscal year 2022.

     SECTION 86. SANDIA PUEBLO SOLID WASTE TRANSFER STATION CONSTRUCT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 71 of Section 18 of Chapter 81 of Laws 2016 to plan, design and construct a solid waste transfer station for the Pueblo of Sandia in Sandoval county is extended through fiscal year 2022.

     SECTION 87. ZIA PUEBLO CHILDHOOD DEVELOPMENT CENTER PLANNING AND DESIGN--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the Indian affairs department project in Subsection 46 of Section 20 of Chapter 81 of Laws 2016 to plan and design phase 1 of a childhood development center for the Pueblo of Zia in Sandoval county is extended through fiscal year 2022.

     SECTION 88. ACEQUIA DEL MOLINO IMPROVEMENT--EXPAND PURPOSE--GENERAL FUND.--The interstate stream commission project in Subsection 57 of Section 33 of Chapter 277 of Laws 2019 to plan and design a diversion structure for the acequia del Molino in Santa Fe county may include planning, designing and constructing improvements to that acequia.

     SECTION 89. EL GUICU COMMUNITY DITCH IMPROVEMENT--EXPAND PURPOSE--GENERAL FUND.--The interstate stream commission project in Subsection 58 of Section 33 of Chapter 277 of Laws 2019 to plan, design, construct, purchase, equip and make improvements, including watershed restoration and fire protection, to El Guicu community ditch in Santa Fe county may include purchasing materials and remediation for that ditch.

     SECTION 90. LOS PINOS ROAD WATER CROSSING IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of transportation project in Subsection 65 of Section 24 of Chapter 81 of Laws 2016 to plan, design and construct improvements to the water crossing at Los Pinos road, also known as county road 54, and arroyo Hondo in La Cienega in Santa Fe county is extended through fiscal year 2022.

     SECTION 91. SANTA FE COUNTY CHIMAYO FIRE STATION ADDITION CONSTRUCTION--EXPAND PURPOSE--EXTEND TIME--SEVERANCE TAX BONDS.--The local government division project in Subsection 190 of Section 22 of Chapter 81 of Laws 2016 to plan, design, construct and equip an addition to the Chimayo fire station in Chimayo in Santa Fe county may include planning, designing and constructing bank stabilization and site improvements. The time of expenditure is extended through fiscal year 2022.

     SECTION 92. SANTA FE COUNTY MADRID FIRE STATION CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 195 of Section 22 of Chapter 81 of Laws 2016 to plan, design, construct and equip improvements to the fire station in Madrid in Santa Fe county is extended through fiscal year 2022.

     SECTION 93. NAMBE PUEBLO ADMINISTRATION BUILDING CONSTRUCT--EXPAND PURPOSE--GENERAL FUND.--The Indian affairs department project in Subsection 122 of Section 31 of Chapter 277 of Laws 2019 to plan, design and construct an administration building at the Pueblo of Nambe in Santa Fe county may include up to four hundred ninety-five thousand dollars ($495,000) for facilities for the Nambe Pueblo economic development cooperative.

     SECTION 94. PALACE OF THE GOVERNORS STATE HISTORY MUSEUM FACILITY, EXHIBITS AND SITE IMPROVEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the cultural affairs department project in Subsection 12 of Section 8 of Chapter 81 of Laws 2016 to plan, design, construct, renovate, furnish, equip and improve the palace of the governors state history museum facility, exhibits and site in Santa Fe in Santa Fe county is extended through fiscal year 2022.

     SECTION 95. SPACEPORT AMERICA CONSTRUCTION OF SATELLITE DEVELOPMENT HANGAR--CHANGE TO MASTER PLANNING AND CONSTRUCTION OF A PAYLOAD PROCESSING CENTER, INFORMATION TECHNOLOGY BUILDING AND VISITOR ACCESS CONTROL FACILITY--EXTEND TIME--GENERAL FUND.--The unexpended balance of the appropriation to the spaceport authority originally authorized in Subsection 54 of Section 5 of Chapter 73 of Laws 2018 and reauthorized in Subsection 64 of Section 5 of Chapter 271 of Laws 2019 for the planning and construction of an aerospace satellite testing and development hangar at spaceport America in Sierra county shall not be expended for the original or reauthorized purpose but is changed for master planning and to plan, design, construct and equip a payload processing center, an information technology building and a visitor access control facility at spaceport America. The time of expenditure is extended through fiscal year 2023.

     SECTION 96. NEW MEXICO VETERANS' HOME IMPROVE WALKWAYS AND PARKING AREAS--CHANGE TO PLAN, DESIGN, CONSTRUCT, RENOVATE, EQUIP AND FURNISH FACILITIES--CHANGE AGENCY--GENERAL FUND.--The unexpended balance of the appropriation to the veterans' services department in Subsection 2 of Section 50 of Chapter 277 of Laws 2019 to plan, design and construct improvements, including walkways and parking areas, at the New Mexico state veterans' home in Truth or Consequences in Sierra county shall not be expended for the original purpose but is appropriated to the capital program fund to plan, design, construct, renovate, equip and furnish facilities at the state veterans' home.

     SECTION 97. NEW MEXICO STATE VETERANS' HOME SURVEILLANCE SYSTEM IMPROVEMENTS--CHANGE AGENCY--GENERAL FUND.--The unexpended balance of the appropriation to the veterans' services department in Subsection 1 of Section 50 of Chapter 277 of Laws 2019 to plan, design, construct and equip improvements to the surveillance system at the New Mexico state veterans' home in Truth or Consequences in Sierra county is appropriated to the capital program fund for that purpose.

     SECTION 98. HOMELAND SECURITY AND EMERGENCY MANAGEMENT DEPARTMENT HAZARD MITIGATION PROJECTS--EXTEND TIME--SECURITIES ENFORCEMENT AND INVESTOR EDUCATION FUND.--The time of expenditure for the homeland security and emergency management department project originally authorized in Laws 2015 (1st S.S.), Chapter 3, Section 80 and reauthorized in Laws 2019, Chapter 280, Section 100 for natural hazard mitigation community projects statewide is extended through fiscal year 2021.

     SECTION 99. HOMELAND SECURITY AND EMERGENCY MANAGEMENT DEPARTMENT HAZARD MITIGATION STATEWIDE--EXTEND TIME--WATER PROJECT FUND.--The time of expenditure for the homeland security and emergency management department project in Laws 2016, Chapter 81, Section 45 for natural hazard mitigation community projects statewide and to match federal emergency management agency funds is extended through fiscal year 2021.

     SECTION 100. SAN ACACIA REACH LEVEE CONSTRUCTION--EXPAND PURPOSE--EXTEND TIME--WATER PROJECT FUND.--The office of the state engineer project in Laws 2016, Chapter 81, Section 46 to plan, design and construct an engineered levee in the San Acacia reach in Socorro county may include planning, design and construction of an engineered levee in the Bernalillo to Belen reach in Bernalillo and Valencia counties. The time of expenditure is extended through fiscal year 2025.

     SECTION 101. CORRECTIONS DEPARTMENT OFFENDER MANAGEMENT INFORMATION SYSTEM PURCHASE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the corrections department project in Subsection B of Section 3 of Chapter 5 of Laws 2016 (2nd S.S.) to purchase and implement a commercial off-the-shelf offender management information system is extended through fiscal year 2021.

     SECTION 102. CHILDREN, YOUTH AND FAMILIES DEPARTMENT YOUTH DIAGNOSTIC AND DEVELOPMENT CENTER MULTIPURPOSE CENTER CONSTRUCTION--EXPAND PURPOSE--EXTEND TIME--SEVERANCE TAX BONDS.--The capital program fund project originally authorized in Subsection 4 of Section 7 of Chapter 81 of Laws 2016 to plan, design, construct, purchase and improve the Manzano and Sandia cottages at the youth diagnostic and development center in Albuquerque in Bernalillo county may include planning, design, construction, renovation, equipping and furnishing facilities for the children, youth and families department statewide. The time of expenditure is extended through fiscal year 2021.

     SECTION 103. CHILDREN, YOUTH AND FAMILIES DEPARTMENT YOUTH DIAGNOSTIC AND DEVELOPMENT CENTER MULTIPURPOSE CENTER CONSTRUCTION--EXPAND PURPOSE--EXTEND TIME--SEVERANCE TAX BONDS.--The capital program fund project originally authorized in Subsection 3 of Section 7 of Chapter 81 of Laws 2016 to plan, design, purchase and install security and code compliance improvements and to convert the existing swimming pool into a multi-use facility at the youth diagnostic and development center in Albuquerque in Bernalillo county may include planning, designing, constructing, renovating, equipping and furnishing children, youth and families department facilities statewide. The time of expenditure is extended through fiscal year 2021.

     SECTION 104. DOE RIVER STEWARDSHIP PROGRAM IMPROVEMENTS STATEWIDE--EXTEND TIME--WATER PROJECT FUND.--The time of expenditure for the department of environment project in Laws 2016, Chapter 81, Section 44 to plan, design and construct projects to improve surface water quality and river habitat statewide is extended through fiscal year 2022.

     SECTION 105. DEPARTMENT OF HEALTH FACILITIES AND INFRASTRUCTURE IMPROVEMENTS--EXPAND PURPOSE--GENERAL FUND.--The capital program fund project in Subsection 17 of Section 7 of Chapter 277 of Laws 2019 to plan, design, construct, improve, renovate, repair, remediate, furnish, equip, purchase and install equipment and for infrastructure upgrades at department of health facilities statewide may include the purchase of mobile health vans.

     SECTION 106. DEPARTMENT OF PUBLIC SAFETY TEXICO PORT OF ENTRY RELOCATION--EXPAND PURPOSE--EXTEND TIME--SEVERANCE TAX BONDS.--The capital program fund project in Subsection 12 of Section 7 of Chapter 81 of Laws 2016 to purchase easements and to plan, design, construct, equip and furnish the relocation of the Texico port of entry in Texico in Curry county may include planning, designing, constructing, renovating, equipping and furnishing department of public safety facilities statewide. The time of expenditure is extended through fiscal year 2021.

     SECTION 107. DEPARTMENT OF PUBLIC SAFETY STATE POLICE ROSWELL DISTRICT OFFICE CONSTRUCTION--EXPAND PURPOSE--EXTEND TIME--SEVERANCE TAX BONDS.--The capital program fund project in Subsection 5 of Section 7 of Chapter 81 of Laws 2016 to plan, design, construct, renovate, furnish and equip the state police district office in Roswell in Chaves county may include planning, designing, constructing, renovating, equipping and furnishing department of public safety facilities statewide. The time of expenditure is extended through fiscal year 2021.

     SECTION 108. LOCAL ECONOMIC DEVELOPMENT ACT PROJECTS STATEWIDE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the economic development department project in Subsection D of Section 3 of Chapter 5 of Laws 2016 (2nd S.S.) for local economic development projects statewide pursuant to the Local Economic Development Act is extended through fiscal year 2021.

     SECTION 109. LOCAL ECONOMIC DEVELOPMENT ACT PROJECTS STATEWIDE--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the economic development department project in Subsection 2 of Section 13 of Chapter 81 of Laws 2016 for economic development projects statewide pursuant to the Local Economic Development Act is extended through fiscal year 2021.

     SECTION 110. VIETNAM VETERANS MEMORIAL IMPROVEMENTS--EXPAND PURPOSE--EXTEND TIME--SEVERANCE TAX BONDS.--The state parks division of the energy, minerals and natural resources department project originally authorized in Subsection 1 of Section 16 of Chapter 81 of Laws 2016 and appropriated to the capital program fund for the Vietnam veterans memorial in Colfax county in Laws 2018, Chapter 68, Section 40 may include planning, designing, constructing, renovating, equipping and furnishing veterans services facilities statewide. The time of expenditure is extended through fiscal year 2021.

     SECTION 111. WATERSHED RESTORATION AND WILDFIRE PROTECTION--EXTEND TIME--WATER PROJECT FUND.--The time of expenditure for the energy, minerals and natural resources department project in Laws 2016, Chapter 81, Section 43 to plan, design and construct watershed restoration improvements, including forest thinning, statewide is extended through fiscal year 2021.

     SECTION 112. NEW MEXICO ACEQUIA COMMISSION STATEWIDE IMPROVEMENT CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the interstate stream commission project in Subsection 21 of Section 21 of Chapter 81 of Laws 2016 to plan, design and construct improvements to acequias statewide for the New Mexico acequia commission is extended through fiscal year 2022.

     SECTION 113. ACEQUIAS DE CHAMISAL Y OJITO MINI-EXCAVATOR PURCHASE--EXPAND PURPOSE--EXTEND TIME--GENERAL FUND.--The interstate stream commission project in Subsection 68 of Section 33 of Chapter 277 of Laws 2019 to purchase a mini-excavator for the acequias de Chamisal y Ojito in Taos county may include purchasing and equipping a flatbed trailer, a portable garage, tools and equipment necessary to secure a mini-excavator to a trailer and planning, designing and constructing a diversion structure for those acequias. The time of expenditure is extended through fiscal year 2022.

     SECTION 114. CAMINO DEL MEDIO REPAIRS AND IMPROVEMENT--CHANGE TO IMPROVE AND REPAIR BLUEBERRY HILL ROAD--SEVERANCE TAX BONDS.--The unexpended balance of the department of transportation project in Subsection 67 of Section 32 of Chapter 80 of Laws 2018 to acquire rights of way and to plan, design, construct and make repairs, including drainage improvements, to camino del Medio in Taos county shall not be expended for the original purpose but is changed to acquire rights of way and to plan, design, construct and make repairs, including drainage improvements, to Blueberry Hill road in Taos county.

     SECTION 115. AMALIA COMMUNITY CENTER PLANNING, DESIGN AND CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 209 of Section 22 of Chapter 81 of Laws 2016 to plan, design and construct a community center in Amalia in Taos county is extended through fiscal year 2022.

     SECTION 116. CERRO REGIONAL MUTUAL DOMESTIC WATER CONSUMERS AND SEWAGE WORKS ASSOCIATION WATER SYSTEM IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 82 of Section 18 of Chapter 81 of Laws 2016 to plan, design and construct water system improvements for the Cerro regional mutual domestic water consumers and sewage works association in Cerro in Taos county is extended through fiscal year 2022.

     SECTION 117. TAOS OLD COUNTY COURTHOUSE CONSTRUCTION--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project in Subsection 213 of Section 22 of Chapter 81 of Laws 2016 to plan, design, construct, renovate, equip and furnish the old county courthouse in Taos in Taos county is extended through fiscal year 2022.

     SECTION 118. LA MERCED DEL MANZANO COMMUNITY CENTER CONSTRUCTION--EXPAND PURPOSE--GENERAL FUND.--The local government division project in Subsection 436 of Section 34 of Chapter 277 of Laws 2019 to plan, design, construct, furnish and equip a multipurpose community center for La Merced del Manzano land grant-merced in Torrance county may include acquisition of land and buildings, renovations and repairs.

     SECTION 119. PUNTA DE AGUA MUTUAL DOMESTIC CONSUMERS' ASSOCIATION MULTIPURPOSE CENTER CONSTRUCTION, FURNITURE AND EQUIPMENT--EXPAND PURPOSE--GENERAL FUND.--The local government division project in Subsection 437 of Section 34 of Chapter 277 of Laws 2019 to plan, design, construct, furnish and equip a multipurpose center for the Punta de Agua mutual domestic consumers' association in Torrance county may include acquiring land and buildings, water system infrastructure improvements and the purchase of heavy equipment for the association.

     SECTION 120. TORREON COMMUNITY CENTER AND LIBRARY IMPROVEMENT--CHANGE TO TORREON MUTUAL DOMESTIC WATER CONSUMERS ASSOCIATION WATER SYSTEM CONSTRUCTION--CHANGE AGENCY--SEVERANCE TAX BONDS.--The unexpended balance of the local government division project in Subsection 184 of Section 26 of Chapter 80 of Laws 2018 to construct interior and exterior improvements and renovations and to purchase and install kitchen equipment, office equipment, fixtures, books and information technology at the Torreon community center and library in Torreon in Torrance county shall not be expended for the original purpose but is appropriated to the department of environment to plan, design and construct a well and water system improvements for the Torreon mutual domestic water consumers association in Torrance county.

     SECTION 121. WILLARD WELL AND WATER SYSTEM IMPROVEMENTS--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the department of environment project in Subsection 90 of Section 18 of Chapter 81 of Laws 2016 to plan, design and construct water system improvements, including a well, in Willard in Torrance county is extended through fiscal year 2022.

     SECTION 122. CLAYTON TOWN HALL RENOVATIONS AND ROOF REPLACEMENT--EXTEND TIME--SEVERANCE TAX BONDS.--The time of expenditure for the local government division project originally authorized in Subsection 217 of Section 22 of Chapter 66 of Laws 2014 to plan, design and construct renovations and roof replacement at the town hall in Clayton in Union county and reauthorized in Laws 2018, Chapter 68, Section 145 is extended through fiscal year 2022.

     SECTION 123. TOWN OF TOME LAND GRANT ABANDONED REAL PROPERTY PURCHASE--EXPAND PURPOSE--GENERAL FUND.--The local government division project in Subsection 460 of Section 34 of Chapter 277 of Laws 2019 to purchase abandoned real property sold by the taxation and revenue department pursuant to Section 7-38-67.1 NMSA 1978 that falls within the traditional land grant boundaries for the town of Tome land grant-merced in Valencia county may include the purchase of the historic jail and surrounding properties within the traditional land grant boundaries of the town of Tome land grant-merced.

     SECTION 124. EMERGENCY.--It is necessary for the public peace, health and safety that this act take effect immediately.